U₃O₈91.74+2.10%FUTURESmodeled

Uranium Price Outlook 2026–2027: Supply & Demand Gap

The uranium supply & demand gap, the U₃O₈ price outlook for 2026–2027, and the bull and bear cases: a data-backed analysis of one of the most asymmetric commodity trades, with the numbers behind each claim.

Updated October 26, 2026 · Demand & reactor-pipeline figures benchmarked to World Nuclear Association reference data and IAEA PRIS; supply history per WNA; projections beyond 2024 are our own model. Figures are consistent with industry outlooks (UxC) as cited in company presentations.

The core thesis

The uranium market runs a structural supply deficit. Mine production covered roughly 90% of reactor requirements in 2024 (per the WNA), up from ~74% in 2020 as production recovered, but the balance still depends on secondary supplies (inventory drawdowns, underfeeding, downblending) that a decade of drawdowns has depleted, and demand is growing faster than committed new mine capacity. Meanwhile, the nuclear renaissance is accelerating: 30+ countries have pledged to triple nuclear capacity by 2050, China is building reactors at an unprecedented pace, and major tech companies are signing nuclear power deals for data centers. New mine supply takes 10-15 years to develop, creating a multi-year window where prices must rise to incentivize sufficient production.

Reactors in Pipeline

466+

Under construction, planned, or proposed

Cumulative Deficit by 2030

266.7 Mlbs

Modeled primary supply gap since 2020, filled by secondary supplies

Bullish Catalysts

10

Active or upcoming positive drivers

Incentive Price

$60-70

$/lb needed for new mine development

Uranium supply & demand gap (2026–2027)

Primary mine supply met ~90% of reactor requirements in 2024 (per the WNA, up from ~74% in 2020), with the balance drawn from thinning secondary inventories. The gap has narrowed as production recovered, but demand growth and a depleted secondary buffer keep the structural story intact. The chart shows WNA-reported actuals through 2024 and our modeled projection of how the gap compounds after that. For the full breakdown, see our uranium supply & demand gap guide.

Uranium Supply-Demand Balance

Annual mine supply vs. reactor demand (Mlbs U₃O₈)

2020–2024: WNA-reported actuals · 2025–2035: Yellowcake modeled projection (lighter bars)

2025 Deficit (Modeled)

16.2 Mlbs

Cumulative by 2030 (Modeled)

266.7 Mlbs

Cumulative by 2035 (Modeled)

547.9 Mlbs

Mine Supply
Reactor Demand
Lighter = Modeled (2025+)
Current Year
modeled · WNA actuals through 2024 · Yellowcake modeled projection afteryellowcakeanalytics.com

U₃O₈ price outlook (2026–2027)

No one can credibly forecast a single uranium price. U₃O₈ trades in a thin spot market, not on an open exchange. Instead of a point forecast, three scenarios:

  • Tightening: demand grows and new supply lags, so spot holds well above the $60-70/lb incentive level needed for new mines and term contract prices follow it higher.
  • Balanced: restarts and new mines roughly meet demand, and the price trades in a range between the incentive level and its recent highs.
  • Loosening: demand stalls or supply surprises to the upside, and the price falls back toward the $60-70/lb incentive level.

Track the inputs rather than any target: the live U₃O₈ spot price and our full uranium price outlook for 2026–2027.

Global Nuclear Reactor Pipeline

Each reactor requires ~200 tonnes of uranium per year

Operable

331

Under Construction

56

Planned

128

Proposed

282

Annual U Demand

53.0K tU

Operable
Under Construction
Planned
Proposed
Data as of late 2025 · World Nuclear Association, IAEA PRISyellowcakeanalytics.com

Bull Case for Uranium

  • Structural supply deficit: Mine production covered ~90% of reactor requirements in 2024 (WNA) — up from ~74% in 2020 — but the balance still relies on finite secondary supplies, and demand growth outpaces committed new mine capacity
  • Nuclear renaissance: 30+ countries have pledged to triple nuclear capacity by 2050 at COP28, driven by energy security and decarbonization goals
  • China building 8-10 reactors per year, the fastest nuclear build-out in history, adding ~4,500 tonnes of annual uranium demand per decade
  • Russian uranium import ban (signed Aug 2024) forces Western utilities to secure alternative supply chains, tightening available supply
  • Tech sector adoption: Microsoft, Google, Amazon, and Meta have signed nuclear power deals for data center energy needs

Bear Case for Uranium

  • Uranium prices have already risen significantly from $18/lb (2016 low) to current levels, potentially pricing in much of the bull thesis
  • Kazakhstan could ramp production faster than expected if supply shortfalls are resolved, flooding the market
  • Reactor construction delays and cost overruns are common (e.g., Vogtle, Hinkley Point C), slowing demand growth timelines
  • Renewable energy + battery storage costs continue to decline, potentially reducing the competitiveness of nuclear in some markets
  • Anti-nuclear sentiment persists in some countries (Germany, Australia), limiting the potential demand growth

Key Catalysts & Upcoming Events

Events that could move the uranium market

COP31 climate summit (Antalya, Türkiye)
by end of Nov 2026policybullish

COP31 runs November 9 to 20, 2026 in Antalya, Türkiye, with Türkiye as COP President and Australia as President of Negotiations under the deal struck at COP30. Follow-up to the COP28 declaration to triple nuclear capacity by 2050: the nuclear-industry programme clusters on November 12 and 13 (Declaration to Triple Nuclear Energy event, World Atomic Days) with a UNFCCC side event on November 19. No official UNFCCC agenda item on nuclear has been published.

Ur-Energy CFO transition
Dec 1, 2026companyneutral

Ur-Energy's Form 8-K of October 28, 2026 says CFO Roger Smith will retire 'effective on December 1, 2026' and that Jade Walle becomes Chief Financial Officer on his retirement, with compensation terms to be set in a later amendment.

Energy Fuels Donald project final investment decision
by end of Q4 2026companyneutral

Energy Fuels' October 13, 2026 Form 8-K describes the Donald rare earth and mineral sands project in Australia as feedstock for the White Mesa Mill 'subject to a FID, which is now targeted for Q4 2026'. A positive decision would commit the project's heavy rare earth feed to the Mill; a delay would push the Mill's heavy REE plans out.

NexGen PCE drilling results for the remainder of the 2026 program
by end of Q4 2026companyneutral

NexGen's August 25, 2026 release on the Patterson Corridor East (PCE) discovery says the company 'is adding a fifth drill rig for the remainder of the 2026 program', with samples 'continuously submitted' to the SRC laboratory and 'results to follow'. Further high-grade intercepts would extend the resource case beyond Arrow.

enCore Rosita wellfield modules 2, 3 and 4 completion
by end of Q4 2026supplyneutral

enCore's Q2 2026 10-Q says the first operational wellfield at Rosita's Production Authorization Area One is complete and 'currently awaiting final authorization for operation', and that 'Modules 2, 3 and 4 are expected to be completed before the end of the year'. Extraction 'can begin as soon as the final authorization is received'.

enCore Dewey-Burdock state permitting after the NRC licence renewal
2026companyneutral

The same 10-Q records that the NRC issued the renewed 20-year source materials licence for Dewey-Burdock on June 30, 2026 and that the EPA injection-control permits were upheld, allowing the project 'to advance through federal permitting with the intent to continue state permitting activities in 2026'. South Dakota state permits are the remaining gate before construction.

Uranium Royalty $40 million Bridge Loan repayment deadline
Jan 31, 2027companybearish

Uranium Royalty's 10-Q for the quarter ended July 31, 2026 states that the company 'is required to repay the $40.0 million Bridge Loan outstanding under its senior secured revolving credit facility by January 31, 2027', and that management plans to meet it from cash, equity financing, royalty cash flow and the sale or monetization of land and other liquid assets. The filing notes substantial doubt about going concern until this is addressed.

Cameco Q4 and full-year 2026 results
Feb 12, 2027companyneutral

Cameco plans to report fourth-quarter and annual 2026 results before market open on February 12, 2027, the first full read on the narrowed 2026 production guidance (19.5 to 20.5 Mlb share) after the extended Key Lake mill shutdown, and the point at which 2027 production and contract-book guidance is set.

Kazatomprom 2027 production guidance
by end of Q1 2027supplyneutral

Kazatomprom sets each year's production guidance in its fourth-quarter trading update (January 27, 2025 for 2025; February 2, 2026 for 2026). The 2027 figure will show whether the TQZ sulphuric acid plant delay (commissioning now between Q3 2027 and Q1 2028) and the August 2026 cost increases constrain output from the world's largest producer.

Boss Energy Honeymoon wellfield expansion (FY2027)
by end of H1 2027supplyneutral

Boss Energy guides FY2027 (July 2026 to June 2027) Honeymoon production of 1.25 to 1.30 Mlb U3O8 at a C1 cost of US$35 to 39/lb and AISC of US$58 to 64/lb, with eight wellfields operating by June 2027 and the EKT1 and EKT2 wellfields online in Q2 and Q4 of FY2027.

Kazatomprom TQZ sulphuric acid plant commissioning
by end of H2 2027supplybullish

Commissioning of the Taiynsha-Qyzyl-Zhar (TQZ) sulphuric acid plant, originally targeted for Q1 2027, is now projected between Q3 2027 and Q1 2028 per Kazatomprom's 1H2026 review. Acid availability is the stated condition on the company's production guidance, so the plant's start date bounds how fast Kazakh output can grow.

UEC Ludeman ISR project start-up
by end of 2027supplyneutral

Uranium Energy Corp commenced production at Burke Hollow (Texas) in April 2026 and has said its Ludeman ISR project in Wyoming is planned for start-up in 2027. Ramp rates have not been quantified by the company.

Paladin PLS construction-licence hearings
by end of Q4 2027companyneutral

Paladin and the Canadian Nuclear Safety Commission have an administrative protocol aimed at completing hearings on the Patterson Lake South construction-licence application at the end of calendar 2027, the regulatory gate before a PLS investment decision. Paladin's FY2027 Langer Heinrich guidance of 5.1 to 5.6 Mlb was reaffirmed in the same quarterly report.

Energy Fuels commercial-scale heavy rare earth metal production
by end of 2027companyneutral

The same 8-K says Australian Strategic Materials, the counterparty to Energy Fuels' VAC transaction, 'is targeting commencement of commercial-scale heavy REE metal production in 2027', which would give Energy Fuels' rare earth business a metal outlet beyond oxide sales; the company has not quantified volumes.

Langer Heinrich royalty production growth into 2027
by end of 2027supplybullish

Uranium Royalty's September 14, 2026 results release notes that Paladin Energy's Langer Heinrich mine, on which URC holds a royalty, 'exceeded its production guidance for its fiscal year 2026 (4.82 million lbs vs guidance of 4.5-4.8 million lbs) and outlined further growth into 2027'. Higher output lifts URC's royalty income from the mine.

Russian LEU import ban: waiver authority ends
Jan 1, 2028policybullish

Under the Prohibiting Russian Uranium Imports Act, any DOE waiver allowing Russian low-enriched uranium into the United States terminates no later than January 1, 2028, with annual waiver caps of 464,183 kg in 2026 and 459,083 kg in 2027. Centrus holds waivers for committed 2026 and 2027 deliveries; its third application, for 2026 and 2027 imports for future sales, was still pending as of its June 30, 2026 10-Q.

Denison Phoenix first production
by end of H1 2028supplyneutral

Denison took a final investment decision on the Phoenix in-situ recovery mine on February 24, 2026, began full-scale construction after completing site preparation (announced July 28, 2026) and aims for first production by mid-2028.

Prosperity One: approvals to begin construction of Kentucky AP1000 campus
by end of 2028demandbullish

The Nuclear Company's proposed campus of up to six Westinghouse AP1000s (~6.6 GW) at Carrs Bottom, Lewis County, Kentucky, with landowner partner Trace Creek; phase 1 is two units. The stated target is to begin site development and secure the federal approvals needed to start construction in 2028. No offtaker, financing or NRC filing has been disclosed. At full build the site demand model puts fuel at about 2.9 Mlb U3O8/yr (modeled).

Bannerman Etango first production
by end of 2028supplyneutral

The Etango joint venture took a positive final investment decision on October 23, 2026; commissioning and first yellowcake production are expected during 2028.

Westinghouse Columbia LEU+ fuel factory start-up
by end of 2030demandbullish

Westinghouse is investing about $1B in a new LEU+ (5–8% U-235) fuel factory at its Columbia Fuel Fabrication Facility in Hopkins, South Carolina; construction is underway with operations targeted for 2030. LEU+ serves longer fuel cycles and power uprates in the existing PWR fleet and AP1000 fuel. Higher enrichment means more natural uranium feed and more SWU per kilogram of fuel. Cameco holds 49% of Westinghouse.

NNSA procurement of unobligated US-origin uranium
by end of 2030policybullish

The National Nuclear Security Administration issued a request for information in August 2026 on domestic capability to supply unobligated US-origin uranium and conversion services for its needs through the 2040s, described by Uranium Energy Corp as about 4 million pounds of U3O8 (1,500 tU as UF6) per year with deliveries starting as early as 2030. A procurement has not been announced.

Russian Uranium Import Restrictions
Ongoingpolicybullish

US ban on Russian enriched uranium imports (Prohibiting Russian Uranium Imports Act, signed August 2024) forces utilities to secure alternative supply. Russia previously supplied ~24% of US enrichment needs. Full impact unfolding through 2028 as waivers expire.

China Nuclear Build-Out
Ongoingdemandbullish

China approving 8-10 new reactors per year, each requiring ~400 tonnes of uranium annually. With 56 operating and 29 under construction, China is executing the largest nuclear build program in history. Cumulative uranium demand increase of ~4,500 tonnes/decade.

Tech Company SMR Commitments
Ongoingdemandbullish

Microsoft, Google, Amazon, and Meta have all signed nuclear power agreements for data center energy. Microsoft signed a 20-year PPA with Constellation for Three Mile Island Unit 1 restart. Google partnered with Kairos Power for SMRs. Amazon invested in X-energy and Talen Energy.

Section 232 critical-minerals agreement (uranium included)
Ongoingpolicyneutral

The January 14, 2026 Section 232 proclamation found imports of processed critical minerals, uranium among them, threaten national security but imposed no tariff, directing Commerce and USTR to negotiate agreements and consider price floors within 180 days. USTR is negotiating a plurilateral Agreement on Trade in Critical Minerals with phased-in, mineral-specific price floors adjusted at the border; no signing date or uranium-specific terms have been announced.

NexGen Rook I construction against the project schedule
Ongoingsupplyneutral

NexGen's Q2 2026 MD&A (prepared August 4, 2026) records that the CNSC licence was issued on March 5, 2026, that licensed construction began on June 8, 2026, and that the company will 'advance construction of the Rook I Project in line with Project schedule and execution plan' while advancing uranium sales negotiations. The company has not published a first-production date.

Ur-Energy Shirley Basin ramp-up feeding Lost Creek
Ongoingsupplyneutral

Ur-Energy's Q2 2026 10-Q says Shirley Basin began extracting uranium in April 2026, received final authorization for full ISR operations in late June 2026, and would begin transporting U3O8 to Lost Creek for processing 'later this summer'; its November 2, 2026 release says full operations were launched in August 2026. The watch item is the ramp in captured pounds and processed output over the coming quarters, which the company has not guided.

Resolved catalysts (6)what happened, with the source
  • Cameco Cigar Lake / McArthur River Ramp-upH1 2026bullish

    Cameco held its February 13, 2026 guidance (19.5 to 21.5 Mlb U3O8 Cameco share; Cigar Lake 17.5 to 18.0 Mlb and McArthur River/Key Lake 14.0 to 16.5 Mlb on a 100% basis) through its May 5 and July 31 reports, with first-half production of 10.1 Mlb (share) against 10.6 Mlb a year earlier after May flooding cut the northern Saskatchewan supply route. On October 30, 2026 it narrowed McArthur River/Key Lake to 14.0 to 14.5 Mlb (100%) and total share production to 19.5 to 20.5 Mlb because of an extended Key Lake mill maintenance shutdown; nine-month 2026 production was 13.6 Mlb (share) versus 15.0 Mlb in 2025.

    2026-10-30·Cameco Q3 2026 results news release (SEC Form 6-K exhibit)

  • Utility Long-Term Contracting CycleQ2 2026neutral

    Industry long-term contracting volumes quoted in Cameco's 2026 quarterly MD&As (from UxC) were about 19 Mlb U3O8 equivalent through March 31, about 33 Mlb through June 30 and about 42 Mlb through September 30, 2026, against about 18, 27 and 45 Mlb in the same periods of 2025 and about 116 Mlb for all of 2025. Cameco described contracting as moderate and below replacement, kept its own book at an average of over 28 Mlb per year for 2026 to 2030, and disclosed no figure for pounds added in 2026.

    2026-10-30·Cameco Q3 2026 MD&A (SEC Form 6-K exhibit), long-term contracting commentary

  • Japanese Reactor RestartsQ1 2026bullish

    One reactor completed a first post-2011 restart in 2026: TEPCO's Kashiwazaki-Kariwa 6 (1,356 MWe) reached criticality on February 9, 2026, connected to the grid on February 16, was suspended for a generator fault, restarted on March 22 and entered commercial operation on April 16, 2026. Per JAIF's plant status of October 9, 2026, 15 of Japan's 33 operable units have returned to commercial operation since 2011. Tomari 3 (NRA approval July 30, 2025) did not restart in 2026; Hokkaido Electric targets 2027.

    2026-10-09·JAIF, Current Status of Nuclear Power Plants in Japan (October 9, 2026)

  • NexGen Rook I Permitting DecisionQ2 2026neutral

    The Canadian Nuclear Safety Commission completed the two-part hearing (November 19, 2025 and February 9 to 12, 2026) and on March 4, 2026 issued a positive environmental assessment decision and licence UML-MINEMILL-ROOK1.00/2036, authorising site preparation and construction of Rook I until March 31, 2036 (announced March 5). NexGen said its final investment decision had already been made; licensed construction activities began on June 8, 2026 and the company held a groundbreaking ceremony on August 13, 2026. The licence does not authorise operation.

    2026-03-05·Canadian Nuclear Safety Commission news release: licence issued to NexGen Energy Ltd. for the Rook I Project

  • Kazatomprom Production GuidanceQ1 2026neutral

    Kazatomprom published 2026 production guidance of 27,500 to 29,000 tU on a 100% basis (14,500 to 15,500 tU attributable) in its 4Q25 operations and trading update on February 2, 2026, subject to sulphuric acid availability, and reiterated it unchanged on April 30, August 3 and August 21, 2026. Preliminary 2025 production was 25,839 tU (13,519 tU attributable), inside the 2025 guidance of 25,000 to 26,500 tU. On August 21, 2026 the company raised its 2026 cost guidance (C1 to US$25.50 to 27.00/lb, AISC to US$39.00 to 40.50/lb) and moved commissioning of the TQZ sulphuric acid plant to between Q3 2027 and Q1 2028.

    2026-02-02·Kazatomprom 4Q25 Operations and Trading Update

  • US Strategic Uranium Reserve PurchasesQ1 2026neutral

    No DOE or NNSA purchase, request for proposals or award for the Strategic Uranium Reserve was announced in 2026, and the FY2026 Energy and Water appropriation enacted on January 23, 2026 (P.L. 119-74) carries no identifiable uranium-reserve line. DOE's 2026 domestic-supply actions went to enrichment instead: on January 5, 2026 it awarded $2.7 billion in task orders ($900 million each to Centrus and General Matter for HALEU and to Orano for LEU, plus $28 million to Global Laser Enrichment), and Centrus signed its $900 million HALEU contract on July 1, 2026.

    2026-01-05·U.S. Department of Energy press release: $2.7 billion in enrichment task orders

Sources: Government legislation, IAEA, World Nuclear Association, company SEC filings, industry reports. Expand each catalyst for its source. Windows close on the calendar: an item past its window is listed under Resolved with what happened, or removed; it is never left as upcoming.

Uranium ETFs & Funds

Investment vehicles for uranium exposure

SRUUFphysical

Sprott Physical Uranium Trust

Holds physical uranium oxide (U3O8). Most direct exposure to the uranium spot price. One trust, two listings: U.UN on the TSX (C$) and SRUUF over the counter in the US (US$). Each unit currently represents about 0.24 lbs of U3O8 (holdings divided by units outstanding; the ratio drifts as new units are issued).

Expense

0.71%

AUM

$7.4B

Holdings

Physical U3O8

URAequity

Global X Uranium ETF

Largest uranium equity ETF. Holds uranium miners, explorers, and nuclear fuel companies. Top holdings include Cameco, the Sprott Physical Uranium Trust, and NexGen.

Expense

0.69%

AUM

$4.99B

Holdings

60 holdings

URNMequity

Sprott Uranium Miners ETF

Pure-play uranium miners ETF with higher concentration than URA, tracking the VettaFi Global Uranium Mining Index. Cameco is the largest holding, with the Sprott Physical Uranium Trust second as a physical-uranium sleeve.

Expense

0.75%

AUM

$1.86B

Holdings

25 holdings incl. physical trust

URNJequity

Sprott Junior Uranium Miners ETF

Focused on junior uranium miners and explorers. Higher risk/reward profile for investors seeking maximum leverage to uranium prices.

Expense

0.80%

AUM

$319M

Holdings

41 junior miners

HURAequity

Global X Uranium Index ETF (TSX)

TSX-listed uranium ETF from Global X Canada tracking the Solactive Global Uranium Pure-Play Index: CAD-denominated exposure to uranium miners plus vehicles that hold physical uranium.

Expense

0.98%

AUM

C$224M

Holdings

Miners + physical uranium vehicles

NLRnuclear

VanEck Uranium and Nuclear ETF

Nuclear-energy ETF tracking the MVIS Global Uranium & Nuclear Energy index. Blends nuclear utilities and reactor names with uranium miners, so it is broader than a pure uranium-price bet. The 0.52% net expense ratio reflects a fee waiver in effect through May 2027.

Expense

0.52%

AUM

$3.8B

Holdings

Miners, utilities & nuclear industrials

NUKZnuclear

Range Nuclear Renaissance Index ETF

Nuclear-energy ETF spanning advanced reactor developers, nuclear utilities, construction & services, and fuel companies. A broad nuclear-renaissance play rather than a uranium-price bet.

Expense

0.85%

AUM

$900M

Holdings

Reactors, utilities & fuel companies

URANnuclear

Themes Uranium & Nuclear ETF

Index fund tracking the BITA Global Uranium and Nuclear Select Index: 43 holdings spanning uranium miners, nuclear utilities, and equipment names, with Constellation Energy the largest position. The lowest fee in this table at 0.35%.

Expense

0.35%

AUM

$31M

Holdings

43 miners, utilities & nuclear names

UXphysical

Roundhill Uranium ETF

Tracks the uranium price synthetically through swap agreements referencing the Sprott Physical Uranium Trust and Yellow Cake plc; it does not hold physical uranium itself. The first US-listed ETF aiming at the metal's price rather than miners, with swap-counterparty and reference-vehicle risk.

Expense

0.75%

AUM

$5M

Holdings

Swaps on physical uranium vehicles

RCTRnuclear

First Trust Bloomberg Nuclear Power ETF

Tracks the Bloomberg Nuclear Power Total Return Index: 45 companies weighted by expected nuclear revenue across power generation, uranium, and equipment & engineering. Top holdings include Hitachi and Constellation Energy.

Expense

0.70%

AUM

$30M

Holdings

45 nuclear-revenue companies

SMRFnuclear

ALPS Nautilus SMR, Nuclear & Technology ETF

Actively managed fund focused on small modular reactors and the nuclear value chain, with a technology sleeve alongside (about 90 holdings). Launched February 2026.

Expense

0.65%

AUM

$18M

Holdings

~90 SMR, nuclear & tech names

TNUKnuclear

Tortoise Nuclear Renaissance ETF

Actively managed, non-diversified fund spanning the global nuclear value chain: uranium mining, reactor design and construction, and plant operators. Launched December 2025 and still very small (about $2M in assets).

Expense

0.75%

AUM

$2M

Holdings

Global nuclear value chain (active)

URAAleveraged

Direxion Daily Uranium Industry Bull 2X Shares

Seeks 200% of the DAILY move of the Solactive United States Uranium and Nuclear Energy ETF Select Index. Daily-reset compounding makes longer-hold returns diverge from 2x the index, so it is a trading vehicle, not a buy-and-hold position. The 1.07% net expense ratio includes acquired fund fees; a fee waiver runs through September 2027.

Expense

1.07%

AUM

$29M

Holdings

2x daily swap exposure to a uranium & nuclear index

Valuation Metrics

Key ratios for comparing uranium companies · P/NAV, margin, D/E & cash/share as of Feb 7, 2026

CompanyCategoryEV/ResourceP/NAVOp. MarginD/ECash/Share
DNNdeveloper$0.78/lb1.2x-42.0%0.02x$0.11
NXEdeveloper$0.52/lb1.4xN/A0.00x$0.82
GLATFdeveloper$0.35/lb0.8xN/A0.45x$0.12
ISOUdeveloper$0.42/lb1.0xN/A0.00x$0.28
BNNLFdeveloper$0.22/lb0.7xN/A0.00x$0.08
LTSRFdeveloper$0.38/lb0.9xN/A0.10x$0.01
DYLLFdeveloper$0.48/lb0.8xN/A0.00x$0.12
ALGEFdeveloper$0.30/lb0.7xN/A0.00x$0.02
UROYroyaltyN/A1.2x25.0%0.00x$0.32
CCJproducer$4.85/lb2.1x24.5%0.22x$2.85
UECproducer$1.92/lb1.8x-8.5%0.06x$0.65
UUUUproducer$2.45/lb1.5x18.2%0.05x$1.10
URGproducer$3.15/lb1.1x-12.0%0.05x$0.18
PALAFproducer$5.20/lb1.9x22.5%0.18x$0.22
BQSSFproducer$1.45/lb1.3x19.0%0.00x$0.18
EUproducer$1.20/lb1.1x-35.0%0.08x$0.14
NATKYproducer$3.20/lb1.6x25.6%0.16x$1.85
PENMFproducer$0.85/lb0.9xN/A0.15x$0.05
WSTRFproducer$0.15/lb0.6xN/A0.14x$0.08
EV/Resource: Lower values suggest the market is pricing the company's uranium pounds cheaply relative to peers.
P/NAV: Below 1.0x indicates the stock trades below estimated net asset value (potentially undervalued).
Op. Margin: Negative margins are common for developers not yet in production.
Snapshot basis: P/NAV, operating margin, D/E, and cash/share are point-in-time snapshots as of Feb 7, 2026, built from company filings.
NAV source: P/NAV uses third-party analyst-consensus or company-published NAV estimates, not a Yellowcake NAV model.
EV/Resource basis: re-derived from live market caps and sourced resource estimates where available.

How investors can use this dashboard

1. Monitor the spot price

Track uranium spot prices on the Spot Price page. The incentive price for new mines is $60-70/lb (a site assumption). Sustained prices above this level signal a healthy market for producers. Look for contango in the Futures curve as a bullish signal.

2. Compare miners

Use the Miners page to compare companies by market cap, reserves, and financials. Key metrics: EV/Resource (lower = cheaper), AISC vs. spot price (margin of safety), and cash position (runway for developers). Click any ticker to see AI-powered SEC filing summaries.

3. Stay informed

Check SEC Filings for the latest company disclosures. AI summaries highlight key points, financial data, operational updates, and risk factors. Watch for 8-K filings (material events) as potential catalysts.

The weekly uranium brief

The week's catalysts, the spot price, and Sprott buying in the weekly brief, free every week. Plus a daily CSV of the uranium equity screener.

Free forever. One email a week + a daily data CSV. By subscribing you agree to receive marketing email from Yellowcake Analytics (privacy policy). Unsubscribe anytime.

Frequently asked questions

What is the uranium supply and demand gap in 2026–2027?

Primary mine production covered about 90% of annual reactor requirements in 2024, per the World Nuclear Association, up from roughly 74% in 2020 as production recovered. The remaining shortfall is still covered by secondary supplies (utility and government inventories, recycled material, and enrichment underfeeding), which most analysts believe are thinning after a decade of drawdowns. With reactor demand rising faster than committed new mine capacity, our model projects the gap widening again through 2030.

What is the U₃O₈ price outlook for 2026–2027?

No one can credibly predict a single uranium price. U₃O₈ trades in a thin spot market, not on an open exchange. The structural deficit and a growing reactor pipeline support a bullish case, and spot has been trading above the roughly $60-70/lb incentive price needed to bring on significant new mine supply. Instead of a point forecast, three scenarios: tightening, balanced, or loosening. Track the live spot price instead of any forecast.

How big is the uranium deficit, and why does it persist?

Reactors consume more uranium each year than mines produce, and a new mine takes 10–15 years to develop, so supply cannot respond quickly to higher prices. Combined with a decade of underinvestment after the last bust and Western restrictions on Russian-origin supply, the deficit is expected to persist for years, until prices stay high enough, long enough, to incentivise new production.

Important disclaimer

This investment thesis and all data on this dashboard are provided for informational and educational purposes only. Nothing herein constitutes investment advice, a recommendation to buy or sell any security, or a solicitation of any kind. Uranium investing carries significant risks including commodity price volatility, regulatory changes, geopolitical risks, and company-specific operational risks. Past performance is not indicative of future results. Always conduct your own research and consult with a qualified financial advisor before making investment decisions. Data sources include World Nuclear Association, IAEA, SEC EDGAR, and various public company filings. Projections and estimates may differ materially from actual results.