Nuclear-for-AI datacenter deal book
Every publicly announced deal where a hyperscaler or datacenter operator secures nuclear power — restarts, PPAs, behind-the-meter and SMR orders — translated from megawatts into modeled annual pounds of U₃O₈. The AI-era demand story, quantified for uranium investors. Every deal is source-linked. Related: the SMR pipeline → and the policy & waiver ledger →
Capacity announced
33.3 GW
8.8 GW firm (signed / operating)
Incremental U₃O₈
Modeled12.4 Mlb/yr
14.7 Mlb/yr gross deal-associated · 1.6 Mlb/yr firm incremental
Deals tracked
20
14 hyperscaler buyers
Ramp
12.0 Mlb
modeled by 2039
| Buyer | Power source | Type | Capacity | U₃O₈ / yr (modeled) | COD | Status | Source |
|---|---|---|---|---|---|---|---|
| Switch | OkloAurora powerhouse fleet | ppanew build | 12,000 MW | 5.30 Mlb | 2029 | announced | Switch press release |
| Amazon (AWS) | X-energyXe-100 (national fleet) | investmentnew build | 5,000 MW | 2.21 Mlb | 2039 | signed | X-energy press release |
| Meta | TerraPowerNatrium (up to 8 units) | investmentnew build | 2,800 MW | 1.24 Mlb | 2032 | signed | POWER Magazine |
| Meta | VistraPerry, Davis-Besse, Beaver Valley | ppaexisting plant | 2,609 MW | 1.15 Mlb0.19 Mlb incremental | 2026 | signed | POWER Magazine |
| Endeavour (Edged data centers) | Deep FissionDeep Fission borehole PWR | mounew build | 2,000 MW | 0.88 Mlb | 2029 | announced | World Nuclear News |
| Amazon (AWS) | Talen EnergySusquehanna Steam Electric Station | ppaexisting plant | 1,920 MW | 0.85 Mlb0.00 Mlb incremental | 2026 | signed | source |
| Standard Power | NuScale Power / ENTRA1 EnergyNuScale VOYGR (Ohio & Pennsylvania) | mounew build | 1,848 MW | 0.82 Mlb | 2029 | announced | source |
| Meta | OkloAurora campus, Pike County, Ohio | ppanew build | 1,200 MW | 0.53 Mlb | 2030 | signed | POWER Magazine |
| Meta | Constellation EnergyClinton Clean Energy Center | ppaexisting plant | 1,121 MW | 0.50 Mlb0.01 Mlb incremental | 2027 | signed | source |
| Microsoft | Constellation EnergyCrane Clean Energy Center (ex-TMI Unit 1) | restartrestart | 835 MW | 0.37 Mlb | 2028 | under-construction | Utility Dive |
| NextEra EnergyDuane Arnold Energy Center | restartrestart | 615 MW | 0.27 Mlb | 2029 | under-construction | source | |
| Kairos PowerKP-FHR fleet (Master Plant Development Agreement) | ppanew build | 500 MW | 0.22 Mlb | 2030 | signed | source | |
| Equinix | OkloAurora powerhouse | ppanew build | 500 MW | 0.22 Mlb | — | announced | source |
| Amazon (AWS) | Energy NorthwestCascade Advanced Energy Facility (Xe-100, Richland WA) | smr-ordernew build | 320 MW | 0.14 Mlb | — | announced | source |
| Amazon (AWS) | Dominion EnergySMR near North Anna Power Station | mounew build | 300 MW | 0.13 Mlb | — | announced | source |
| Tennessee Valley Authority / Kairos PowerHermes 2 (Oak Ridge, TN) | ppanew build | 50 MW | 0.02 Mlb | 2030 | under-construction | source | |
| Nvidia | Valar AtomicsWard 250 (30 MW waterless AI factory) | mounew build | 30 MW | 0.01 Mlb | — | announced | Deseret News |
| Equinix | Radiant NuclearKaleidos microreactor | smr-ordernew build | — | — | — | announced | Equinix newsroom |
| Fermi America | Westinghouse (AP1000)Project Matador / HyperGrid, Amarillo TX | behind-the-meternew build | — | — | — | announced | Data Center Dynamics |
| Oracle | Undisclosed vendorThree SMRs for a 1+ GW AI data center | behind-the-meternew build | — | — | — | announced | CNBC |
Methodology
ModeledAnnual uranium demand per deal is MODELED from disclosed nuclear capacity: MW (nameplate) / 1000 = GWe; multiplied by 170 tU/GWe/yr (industry standard, ~85% capacity factor, per the site demand model) and by 0.0026 Mlb U3O8/tU (model v2). Gross deal-associated fuel (all disclosed MW, overlap-deduped) is reported separately from INCREMENTAL fuel vs the operating-fleet baseline: eventType classifies each deal (existing-ppa / restart / uprate / new-build / life-extension), existing-plant PPAs contribute only their uprate share (incrementalMw), and deals sharing physical capacity carry an overlapGroup so a master agreement and its first tranche never double count. bindingStatus separates binding PPAs from frameworks/MOUs; only binding deals with firm status enter firm totals. Cancelled deals and deals with undisclosed capacity are excluded from the demand rollup. Capacities and dates are the operators' own disclosed figures where available.
Deal capacities and dates are the operators' own disclosed figures where available; every deal links to its primary source. Deals without a verifiable source do not ship, and those with undisclosed capacity are listed but excluded from the demand rollup — we do not guess. The uranium translation is modeled, not a quote. To convert megawatts into uranium demand yourself, the reactor-fuel guide walks the math end to end. See full methodology.
The gigasite, in uranium pounds
Reactor-fleet visions, translated into the only unit that matters here: pounds of U₃O₈ a year. Pick a scenario or set your own fleet.
Illustrative take on the thousands-of-reactors gigasite vision, at the announced AI-factory unit size.
Fleet capacity
30.0 GW
U₃O₈ demand (modeled)
13.3 Mlb/yr
5,100 tU/yr
Vs the AI deal book
0.90×
the announced total above
Modeled, not a forecast: nameplate MWe × 170 tU per GWe-year (~85% capacity factor, LWR fuel cycle) × 0.0026 Mlb U₃O₈ per tU — the same constants as the deal book and the site demand model. Advanced designs' real fuel cycles (HALEU enrichment levels, burnup, load factors) will differ; treat results as order-of-magnitude context, not procurement math.
Free report: The AI-Nuclear Uranium Demand Report
Every announced nuclear-for-datacenter deal, converted into modeled pounds of uranium — the demand wave, quantified.
Cite this page
Using our data in an article or report? Please credit Yellowcake Analytics with a link.
Yellowcake Analytics. "Nuclear-for-AI Datacenter Deal Book." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/datacenter-deals.