U₃O₈––.––FUTURESmodeled

Uranium production by company and operation

Quarterly dried and drummed U3O8 per producer and per operation, copied from each company's own quarterly report with the wording, the ownership basis and a link to the document. Upstream stages (ore mined, loaded on resin, precipitated) sit beside the headline, labelled, and are never substituted for it. Guidance stays in the guidance tracker; this page shows year-to-date attainment against it where the basis matches. How the stages differ →

Latest reported production

AttributableDried and drummed U3O8, company share, latest period on record
CompanyStatusPeriodProduction, Mlb U3O8Guidance attainmentSource
Cameco CorporationCCJProducingthree months ended June 30, 20263.90unverified—source
Paladin Energy LtdPALAFProducingQ4 FY2026 (quarter ended 30 June 2026)0.92unverifiedderivedFY drummed 4.82 of 4.5–4.8 Mlb, 104% of midpointsource
Energy Fuels IncUUUUProducingthree months ended June 30, 20260.86unverifiedderived—source
Boss Energy LtdBQSSFRamp-upQ4 FY26 (June 2026 quarter)0.36unverifiedderivedFY drummed 1.41 of 1.40–1.45 Mlb, 99% of midpointsource
enCore Energy CorpEUProducingNo production disclosed for the latest expected period.
Kazatomprom JSCNATKYProducingNo production disclosed for the latest expected period.
Lotus Resources LtdLTSRFRestartNo production disclosed for the latest expected period.
Peninsula Energy LtdPENMFRamp-upNo production disclosed for the latest expected period.
Ur-Energy IncURGProducingNo production disclosed for the latest expected period.
Uranium Energy CorpUECRestartNo production disclosed for the latest expected period.
Western Uranium & Vanadium CorpWSTRFRestartNo production disclosed for the latest expected period.

Not disclosed means the company did not publish a dried and drummed figure for the period; no upstream stage is substituted. Badges: unverified (entered, not yet checked a second time), derived (ownership share applied to a reported figure, note on hover), revised (supersedes an earlier row), stale (a newer report should exist for the company's cadence).

By company and operation

Operation rows are on the 100% basis; company-level rows are the company's share. Dried and drummed is in bold. Hover a figure for the company's wording and unit; click it to open the document.

Boss Energy LtdBQSSFRamp-upGuidance attainment: FY drummed 1.41 of 1.40–1.45 Mlb, 99% of midpoint (100% basis)
Boss Energy LtdCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
Q4 FY26 (June 2026 quarter)0.33unverifiedsource
FY26 (year ended 30 June 2026)full year1.40unverifiedsource
Q3 FY26 (March 2026 quarter)0.33unverifiedsource
Q2 FY26 (December 2025 quarter)0.35unverifiedsource
Q1 FY26 (September 2025 quarter)0.40unverifiedsource
Q4 FY25 (June 2025 quarter)0.10unverifiedsource
FY25 Total (year ended 30 June 2025)full year0.65unverifiedsource
March Q3 FY25 (March 2025 quarter)0.15unverifiedsource
HoneymoonOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisLoaded on resinMlb U3O8, 100% basisSource
Q4 FY26 (June 2026 quarter)0.36unverified0.37unverifiedsource
FY26 (year ended 30 June 2026)full year1.41unverified1.37unverifiedsource
Q3 FY26 (March 2026 quarter)0.20unverified0.22unverifiedsource
Q2 FY26 (December 2025 quarter)0.46unverified0.41unverifiedsource
Q1 FY26 (September 2025 quarter)0.39unverified0.38unverifiedsource
Q4 FY25 (June 2025 quarter)0.35unverified0.40unverifiedsource
FY25 Total (year ended 30 June 2025)full year0.87unverified0.97unverifiedsource
March Q3 FY25 (March 2025 quarter)0.30unverified0.25unverifiedsource
Cameco CorporationCCJProducing
Cameco CorporationCompany levelAttributable
PeriodDried and drummedMlb U3O8, attributableSold (may include purchased material)Mlb U3O8, attributableSource
three months ended June 30, 20263.90unverified7.10unverifiedsource
three months ended March 31, 20266.20unverified7.80unverifiedsource
three months ended December 31, 20256.00unverified11.2unverifiedsource
year ended December 31, 2025full year21.0unverified33.0unverifiedsource
three months ended September 30, 20254.40unverified6.10unverifiedsource
three months ended June 30, 20254.60unverified8.70unverifiedsource
three months ended March 31, 20256.00unverified6.90unverifiedsource
Cigar LakeOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
second quarter of 20262.90unverifiedsource
first quarter of 20264.90unverifiedsource
2025full year19.1unverifiedsource
third quarter of 20254.00unverifiedsource
second quarter of 20255.10unverifiedsource
three months ended March 31, 2025 (first quarter of 2025)5.00unverifiedsource
Inkai (JV)Operation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
second quarter of 2026 (the quarter)2.80unverifiedsource
first quarter of 2026 (the quarter)2.50unverifiedsource
2025full year8.40unverifiedsource
third quarter of 2025 (the quarter)2.40unverifiedsource
second quarter of 2025 (the quarter)2.30unverifiedsource
three months ended March 31, 2025 (the quarter)1.10unverifiedsource
McArthur River / Key LakeOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
second quarter of 20263.30unverifiedsource
first quarter of 20265.00unverifiedsource
2025full year15.1unverifiedsource
third quarter of 20253.20unverifiedsource
second quarter of 20252.60unverifiedsource
three months ended March 31, 2025 (first quarter of 2025)4.60unverifiedsource
Energy Fuels IncUUUUProducing
Energy Fuels IncCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
three months ended June 30, 20260.31unverifiedderivedsource
three months ended March 31, 20260.51unverifiedderivedsource
year ended December 31, 2025full year0.65unverifiedsource
Q3-20250.24unverifiedsource
three and six months ended June 30, 20250.05unverifiedsource
three months ended March 31, 20250.00unverifiedsource
Pinyon Plain / White Mesa MillOperation100% basis
PeriodOre minedMlb U3O8, 100% basisSource
Three Months Ended June 30, 20260.25unverifiedsource
three months ended March 31, 20260.38unverifiedsource
year ended December 31, 2025full year1.53unverifiedsource
three months ended September 30, 20250.41unverifiedsource
three months ended June 30, 20250.64unverifiedsource
White Mesa MillFacility100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
three months ended June 30, 20260.86unverifiedsource
Q1 2026 (three months ended March 31, 2026)0.79unverifiedsource
year ended December 31, 2025full year1.01unverifiedsource
three months ended June 30, 20250.18unverifiedsource
three months ended March 31, 20250.15unverifiedsource
Paladin Energy LtdPALAFProducingGuidance attainment: FY drummed 4.82 of 4.5–4.8 Mlb, 104% of midpoint (100% basis)
Langer HeinrichOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSold (may include purchased material)Mlb U3O8, 100% basisSource
Q4 FY2026 (quarter ended 30 June 2026)1.23unverified1.35unverifiedsource
FY2026 (year ended 30 June 2026)full year4.82unverified4.35unverifiedsource
Q3 FY2026 (quarter ended 31 March 2026)1.29unverified1.03unverifiedsource
Q2 FY2026 (quarter ended 31 December 2025)1.23unverified1.43unverifiedsource
Q1 FY2026 (quarter ended 30 September 2025)1.07unverified0.53unverifiedsource
Q4 FY2025 (quarter ended 30 June 2025)0.99unverified0.71unverifiedsource
FY2025 (year ended 30 June 2025)full year3.02unverified2.71unverifiedsource
Q3 FY2025 (quarter ended 31 March 2025)0.75unverified0.87unverifiedsource
Real

Methodology

What counts as production
Production on this site means dried and drummed (packaged) U3O8: finished product ready for delivery to a converter or customer. It is the stage the U.S. EIA uses for uranium concentrate output and the only stage comparable between in-situ recovery and conventional producers. When a company does not disclose drummed production for a period, the headline reads Not disclosed. No upstream stage is ever substituted for it.
Stages
Each figure is stored under the stage the company reported, with the company's own wording kept verbatim: ore mined (contained pounds in ore extracted), ore stockpiled, ore milled, loaded on resin (uranium captured on ion-exchange resin), precipitated (eluted and precipitated as slurry or wet cake), dried and drummed (the headline), shipped (delivered to a converter or customer) and sold. Sold pounds may include purchased material, so sales are never read as production. Figures are never summed across stages.
100% basis and attributable
A 100% basis figure is the operation's total output; an attributable figure is the company's share. Operation pages and operation rows show 100% basis; company pages and every cross-company total use the attributable basis, because adding 100% figures across joint-venture partners would count Inkai, Cigar Lake and McArthur River twice. Where a company reports only one basis and its ownership share is cited on the operation, the other basis is derived by applying that share and carries a derived badge with the note. Cameco's share of JV Inkai is a purchase entitlement that differs from its 40% interest, so it is never derived.
Guidance and attainment
Annual production guidance stays in the guidance tracker, with its revisions and withdrawals. Where quarterly drummed production exists on the same basis as a company's guidance window, the hub shows year-to-date production against the guided range and as a share of the range midpoint, labelled as the midpoint. Guidance on a different basis or in a different unit is not compared.
Sources, verification and revisions
Every figure is copied from a company document: a quarterly MD&A or 10-Q, an ASX quarterly activities report or a results release, with the document URL, publication date, location and a verbatim quote. Figures appear as soon as they are entered; rows that have not yet been checked a second time carry an unverified badge. A revised figure is stored as a new row that supersedes the old one, which is kept, and the revised badge shows the chain.
Units and reporting periods
Figures are kept in the unit the company used and normalised to pounds of U3O8 through one shared conversion module: pounds, thousand pounds and million pounds are exact scale changes; kilograms and tonnes of U3O8 use 2.204623 lb per kg; tonnes of uranium metal use the U3O8 mass fraction of 0.848 from the same module. Every row carries real calendar dates, so a June-year reporter such as Paladin or Boss aligns with a calendar-year reporter by date overlap, never by label.
Granularity by company
Data is stored at the most granular level each company reports: per operation for Cameco, per mill facility for Energy Fuels (finished U3O8 is produced at the White Mesa Mill), per mine for Paladin and Boss, and at company level where only a consolidated figure exists. A company total uses one level only, the operation rows when every listed operation reported, otherwise the company-level row, never both.

See the site-wide methodology for provenance labels and the other datasets.

Cite this page

Using our data in an article or report? Please credit Yellowcake Analytics with a link.

Citation

Yellowcake Analytics. "Uranium Production by Company and Operation." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/production.

HTML (with link)

<a href="https://www.yellowcakeanalytics.com/production">Uranium Production by Company and Operation</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)

The weekly uranium brief

Spot moves, SPUT flows, filings, and contract news, once a week. Plus a free daily CSV of our uranium equity screener snapshot.

Free forever. One email a week + a daily data CSV. By subscribing you agree to receive marketing email from Yellowcake Analytics (privacy policy). Unsubscribe anytime.