U₃O₈92.56+2.82%FUTURESmodeled

Uranium production by company and operation

Quarterly dried and drummed U3O8 per producer and per operation, copied from each company's own quarterly report with the wording, the ownership basis and a link to the document. Upstream stages (ore mined, loaded on resin, precipitated) sit beside the headline, labelled, and are never substituted for it. The one exception, a company that publishes only a combined figure spanning both (badged combined), is declared per company. Guidance stays in the guidance tracker; this page shows year-to-date attainment against it where the basis matches. How the stages differ →

Latest reported production

AttributableDried and drummed U3O8, company share, latest period on record
CompanyStatusPeriodProduction, Mlb U3O8Guidance attainmentSource
Kazatomprom JSCNATKYtables ↓Producingthree months ended September 30, 202610.18unverified—source
Cameco CorporationCCJtables ↓Producingthree months ended September 30, 20263.50unverified—source
Energy Fuels IncUUUUtables ↓Producingnine months ended September 30, 20261.66unverified—source
Paladin Energy LtdPALAFtables ↓ProducingQ1 FY20270.750derived—source
Boss Energy LtdBQSSFtables ↓Ramp-upQ1 FY20270.359unverified—source
Ur-Energy IncURGtables ↓ProducingQ3 20260.105unverified—source
Lotus Resources LtdLTSRFtables ↓Restartthree months ended September 30, 20260.087unverifiedderived—source
Uranium Energy CorpUECtables ↓Restartfourth quarter of Fiscal 2026 (first full quarter of operation; May 1 to July 31, 2026) (sum of 2 operations)0.083combined—source
Peninsula Energy LtdPENMFtables ↓Ramp-upQ1 FY20270.016unverified—source
enCore Energy CorpEUtables ↓Producinglatest on record 30 Jun 2026staleNot disclosed—
Western Uranium & Vanadium CorpWSTRFRestartNo production disclosed for the latest expected period.

Not disclosed means the company did not publish a dried and drummed figure for the period; no upstream stage is substituted. Badges: unverified (captured automatically from a new filing, waiting for a second look), combined (the company reports one figure spanning dried and drummed and the stage before it, note on hover), derived (a share below 100% applied to a reported figure, or a sum the company did not state, note on hover), revised (supersedes an earlier row), stale (a newer report should exist for the company's cadence).

By company and operation 10 companies

Each company is collapsed; open it for the period-by-period tables, or use Expand all. Operation rows are on the 100% basis; company-level rows are the company's share. Dried and drummed is in bold. Hover a figure for the company's wording and unit; click it to open the document. The derived line under a company name (utilization of nameplate, pounds in circuit, implied recovery) is computed from the reported rows at read time and badged derived; hover for the derivation.

Kazatomprom JSCNATKYProducing10.18 Mlbunverified three months ended September 30, 2026Company level only, 8 periods
Kazatomprom JSCCompany levelAttributable
PeriodDried and drummedMlb U3O8, attributableSold (may include purchased material)Mlb U3O8, attributableSource
three months ended September 30, 202610.18unverified16.75unverifiedsource
three months ended 30 June 20269.9015.73source
three months ended 31 March 20268.443.99source
three months ended 31 December 20259.6414.87source
year ended 31 December 2025full year35.1548.08revisedsource
three months ended 30 September 20258.7713.39source
three months ended 30 June 20259.0113.17source
three months ended 31 March 20257.71revised6.66source
Cameco CorporationCCJProducing3.50 Mlbunverified three months ended September 30, 2026Company and 3 operations, 28 periods
McArthur River / Key Lake:utilization 25% of nameplatederivedCigar Lake:utilization 93% of nameplatederivedInkai (JV):utilization 108% of nameplatederived
Cameco CorporationCompany levelAttributable
PeriodDried and drummedMlb U3O8, attributableSold (may include purchased material)Mlb U3O8, attributableSource
three months ended September 30, 20263.50unverified5.60unverifiedsource
three months ended June 30, 20263.907.10source
three months ended March 31, 20266.207.80source
three months ended December 31, 20256.0011.20source
year ended December 31, 2025full year21.0033.00source
three months ended September 30, 20254.406.10source
three months ended June 30, 20254.608.70source
three months ended March 31, 20256.006.90source
Cigar LakeOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
Q3 20264.20unverifiedsource
second quarter of 20262.90source
first quarter of 20264.90source
2025full year19.10source
third quarter of 20254.00source
second quarter of 20255.10source
three months ended March 31, 2025 (first quarter of 2025)5.00source
Inkai (JV)Operation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
second quarter of 2026 (the quarter)2.80source
first quarter of 2026 (the quarter)2.50source
2025full year8.40source
third quarter of 2025 (the quarter)2.40source
second quarter of 2025 (the quarter)2.30source
three months ended March 31, 2025 (the quarter)1.10source
McArthur River / Key LakeOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
Q3 20261.60unverifiedsource
second quarter of 20263.30source
first quarter of 20265.00source
2025full year15.10source
third quarter of 20253.20source
second quarter of 20252.60source
three months ended March 31, 2025 (first quarter of 2025)4.60source
Energy Fuels IncUUUUProducing1.66 Mlbunverified nine months ended September 30, 2026Company and 2 operations, 16 periods
Energy Fuels IncCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
three months ended June 30, 20260.310derivedsource
three months ended March 31, 20260.510derivedsource
year ended December 31, 2025full year0.650source
Q3-20250.240source
three and six months ended June 30, 20250.050source
three months ended March 31, 20250.000source
Pinyon Plain / White Mesa MillOperation100% basis
PeriodOre minedMlb U3O8, 100% basisSource
Three Months Ended June 30, 20260.250source
three months ended March 31, 20260.375source
year ended December 31, 2025full year1.53source
three months ended September 30, 20250.415source
three months ended June 30, 20250.635source
White Mesa MillFacility100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
three months ended June 30, 20260.865source
Q1 2026 (three months ended March 31, 2026)0.790source
year ended December 31, 2025full year1.01source
three months ended June 30, 20250.180source
three months ended March 31, 20250.150source
Paladin Energy LtdPALAFProducing0.750 Mlbderived Q1 FY20271 operation, 9 periods
Langer Heinrich:utilization 66% of nameplatederived
Langer HeinrichOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSold (may include purchased material)Mlb U3O8, 100% basisSource
Q1 FY20271.001.16source
Q4 FY2026 (quarter ended 30 June 2026)1.231.35source
FY2026 (year ended 30 June 2026)full year4.824.35source
Q3 FY2026 (quarter ended 31 March 2026)1.291.03source
Q2 FY2026 (quarter ended 31 December 2025)1.231.43source
Q1 FY2026 (quarter ended 30 September 2025)1.070.534source
Q4 FY2025 (quarter ended 30 June 2025)0.9940.710source
FY2025 (year ended 30 June 2025)full year3.022.71source
Q3 FY2025 (quarter ended 31 March 2025)0.7450.872source
Boss Energy LtdBQSSFRamp-up0.359 Mlbunverified Q1 FY2027Company and 2 operations, 26 periods
Honeymoon:utilization 58% of nameplatederivedin circuit -0.056 Mlbderived
Boss Energy LtdCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
Q1 FY20270.301unverifiedsource
Q4 FY26 (June 2026 quarter)0.325source
FY26 (year ended 30 June 2026)full year1.40source
Q3 FY26 (March 2026 quarter)0.325source
Q2 FY26 (December 2025 quarter)0.350source
Q1 FY26 (September 2025 quarter)0.400source
Q4 FY25 (June 2025 quarter)0.100source
FY25 Total (year ended 30 June 2025)full year0.650source
March Q3 FY25 (March 2025 quarter)0.150source
Alta MesaOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisLoaded on resinMlb U3O8, 100% basisSource
Q1 FY20270.010unverified—source
Q4 FY26 (June 2026 quarter)0.045—source
FY26 (year ended 30 June 2026)full year0.491—source
Q3 FY26 (March 2026 quarter)0.097—source
Q2 FY26 (December 2025 quarter)0.143—source
Q1 FY26 (September 2025 quarter)0.206—source
Q4 FY25 (June 2025 quarter) - restated on drummed basis0.1800.204source
March Q3 FY25 (March 2025 quarter)—0.098source
HoneymoonOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisLoaded on resinMlb U3O8, 100% basisSource
Q1 FY20270.359unverified0.337unverifiedsource
Q4 FY26 (June 2026 quarter)0.3620.371source
FY26 (year ended 30 June 2026)full year1.411.37source
Q3 FY26 (March 2026 quarter)0.2030.221source
Q2 FY26 (December 2025 quarter)0.4560.406source
Q1 FY26 (September 2025 quarter)0.3860.376source
Q4 FY25 (June 2025 quarter)0.3490.396source
FY25 Total (year ended 30 June 2025)full year0.8720.969source
March Q3 FY25 (March 2025 quarter)0.2960.247source
Ur-Energy IncURGProducing0.105 Mlbunverified Q3 2026Company and 2 operations, 26 periods
Lost Creek:utilization 19% of nameplatederivedin circuit -0.011 Mlbderived
Ur-Energy IncCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
Q3 20260.190unverifiedsource
2026 Q20.215source
2026 Q10.055source
2025 Q40.165source
2025 (fiscal year ended December 31, 2025)full year0.440source
2025 Q30.110source
2025 Q20.165source
2025 Q10.000source
Q4 20240.395unverifiedsource
year ended December 31, 2024full year0.570unverifiedsource
Q3 20240.100unverifiedsource
Q2 20240.075unverifiedsource
Lost CreekOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisLoaded on resinMlb U3O8, 100% basisShippedMlb U3O8, 100% basisSource
Q3 20260.105unverified0.155unverified0.075unverifiedsource
2026 Q20.1410.105unverified0.150source
2026 Q10.0960.1100.104source
2025 Q40.1220.0780.138source
2025 (fiscal year ended December 31, 2025)full year0.4100.3710.420source
2025 Q30.0940.0890.070source
2025 Q20.1120.1290.105source
2025 Q10.0830.0740.106source
Q4 2024—0.082unverified0.067unverifiedsource
year ended December 31, 2024full year—0.266unverified0.240unverifiedsource
Q3 2024—0.075unverified0.067unverifiedsource
Q2 2024—0.071unverified0.070unverifiedsource
Q1 2024—0.038unverified0.035unverifiedsource
Shirley BasinOperation100% basis
PeriodLoaded on resinMlb U3O8, 100% basisSource
2026 Q20.011source
Lotus Resources LtdLTSRFRestart0.087 Mlbunverifiedderived three months ended September 30, 20261 operation, 6 periods
Kayelekera:utilization 17% of nameplatederived
KayelekeraOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
three months ended September 30, 20260.102unverifiedsource
June 2026 Quarter0.156source
FY2026 (year ended 30 June 2026)full year0.332source
March 2026 Quarter (restated)0.078revisedsource
Dec 2025 Quarter (restated)0.072revisedsource
Sept 2025 Quarter0.025source
Uranium Energy CorpUECRestart0.083 Mlbcombined fourth quarter of Fiscal 2026 (first full quarter of operation; May 1 to July 31, 2026) (sum of 2 operations)Company and 3 operations, 13 periods
Uranium Energy CorpCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
Fiscal 2026 (fiscal year ended July 31, 2026)full year0.400source
second quarter of Fiscal 2026 (three months ended January 31, 2026)0.200source
Fiscal 2025 (fiscal year ended July 31, 2025)full year0.810source
second quarter of Fiscal 2025 (three months ended January 31, 2025)0.600source
Burke HollowOperation100% basis
PeriodPrecipitatedMlb U3O8, 100% basisSource
fourth quarter of Fiscal 2026 (first full quarter of operation; May 1 to July 31, 2026)0.017source
Fiscal 2026 (fiscal year ended July 31, 2026; first three months since commissioning, April/May to July 31, 2026)full year0.017source
Christensen Ranch / IrigarayOperation100% basis
PeriodPrecipitatedMlb U3O8, 100% basisSource
fourth quarter of Fiscal 2026 (May 1 to July 31, 2026)0.065source
Fiscal 2026 (fiscal year ended July 31, 2026)full year0.212source
third fiscal quarter of 2026 (three months ended April 30, 2026)0.032source
second fiscal quarter of 2026 (three months ended January 31, 2026)0.046source
three months ended October 31, 2025 (first quarter of Fiscal 2026)0.069source
Fiscal 2025full year0.104source
Irigaray Central Processing PlantFacility100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
Fiscal 2025full year0.026source
Peninsula Energy LtdPENMFRamp-up0.016 Mlbunverified Q1 FY2027Company and 1 operation, 11 periods
Lance Projects:utilization 2% of nameplatederivedin circuit 0.010 Mlbderived
Peninsula Energy LtdCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
June 2025 quarter (quarter ended 30 June 2025; company fiscal label 4Q25)0.200source
the 2025 financial year (year ended 30 June 2025)full year0.200source
Lance ProjectsOperation100% basis
PeriodDried and drummedMlb U3O8, 100% basisLoaded on resinMlb U3O8, 100% basisShippedMlb U3O8, 100% basisSold (may include purchased material)Mlb U3O8, 100% basisSource
Q1 FY20270.016unverified0.018unverified——source
4Q26 Jun-26 (June Quarter, quarter ended 30 June 2026)0.0110.0140.0110.010source
YTD FY26 (financial year 1 July 2025 to 30 June 2026; full FY26)full year0.0170.025——source
3Q26 Mar-26 (quarter ended 31 March 2026)0.0020.004——source
2Q26 Dec-25 (quarter ended 31 December 2025)0.0030.007——source
1Q26 Sep-25 (quarter ended 30 September 2025)0.001revised0.000——source
June 2025 quarter (quarter ended 30 June 2025; company fiscal label 4Q25)—0.000——source
FY25 (financial year ended 30 June 2025)full year—0.007revised——source
March quarter (quarter ended 31 March 2025; company fiscal label 3Q25)—0.006——source
enCore Energy CorpEUProducingNot disclosedstaleCompany and 2 operations, 8 periods
enCore Energy CorpCompany levelAttributable
PeriodSold (may include purchased material)Mlb U3O8, attributableSource
Three Months Ended June 30, 20260.215source
Three Months Ended March 31, 20260.270source
Year Ended December 31, 2025full year0.655source
Three Months Ended September 30, 20250.130source
Three Months Ended June 30, 20250.060source
Three Months Ended March 31, 20250.290source
Alta MesaOperation100% basis
PeriodLoaded on resinMlb U3O8, 100% basisSource
2025 (extraction history as of December 31, 2025)full year0.699source
Rosita (South Texas Integrated Project)Operation100% basis
PeriodDried and drummedMlb U3O8, 100% basisSource
2025 (extraction history from January 1, 2024 to December 31, 2025)full year0.006source
Real

Methodology

What counts as production
Production on this site means dried and drummed (packaged) U3O8: finished product ready for delivery to a converter or customer. It is the stage the U.S. EIA uses for uranium concentrate output and the only stage comparable between in-situ recovery and conventional producers. When a company does not disclose drummed production for a period, the headline reads Not disclosed. No upstream stage is ever substituted for it. One declared exception: when a company reports only a single combined figure that includes dried and drummed U3O8 together with the stage before it, and no separate drummed figure (Uranium Energy Corp since Fiscal 2026 reports "precipitated uranium and dried and drummed U3O8"), that combined figure is its headline, labelled as combined, because it is the company's own production measure and the alternative would be a figure from an earlier year.
Stages
Each figure is stored under the stage the company reported, with the company's own wording kept verbatim: ore mined (contained pounds in ore extracted), ore stockpiled, ore milled, loaded on resin (uranium captured on ion-exchange resin), precipitated (eluted and precipitated as slurry or wet cake), dried and drummed (the headline), shipped (delivered to a converter or customer) and sold. Sold pounds may include purchased material, so sales are never read as production. Figures are never summed across stages.
100% basis and attributable
A 100% basis figure is the operation's total output; an attributable figure is the company's share. Operation pages and operation rows show 100% basis; company pages and every cross-company total use the attributable basis, because adding 100% figures across joint-venture partners would count Inkai, Cigar Lake and McArthur River twice. Where a company reports only one basis and its ownership share is cited on the operation, the other basis is derived by applying that share and carries a derived badge with the note. Cameco's share of JV Inkai is a purchase entitlement that differs from its 40% interest, so it is never derived.
Guidance and attainment
Annual production guidance stays in the guidance tracker, with its revisions and withdrawals. Where quarterly drummed production exists on the same basis as a company's guidance window, the hub shows year-to-date production against the guided range and as a share of the range midpoint, labelled as the midpoint. Guidance on a different basis or in a different unit is not compared.
Sources, verification and revisions
Every figure is copied from a company document: a quarterly MD&A or 10-Q, an ASX quarterly activities report or a results release, with the document URL, publication date, location and a verbatim quote. Figures appear as soon as they are entered; rows that have not yet been checked a second time carry an unverified badge. A revised figure is stored as a new row that supersedes the old one, which is kept, and the revised badge shows the chain.
Units and reporting periods
Figures are kept in the unit the company used and normalised to pounds of U3O8 through one shared conversion module: pounds, thousand pounds and million pounds are exact scale changes; kilograms and tonnes of U3O8 use 2.204623 lb per kg; tonnes of uranium metal use the U3O8 mass fraction of 0.848 from the same module. Every row carries real calendar dates, so a June-year reporter such as Paladin or Boss aligns with a calendar-year reporter by date overlap, never by label.
Granularity by company
Data is stored at the most granular level each company reports: per operation for Cameco, per mill facility for Energy Fuels (finished U3O8 is produced at the White Mesa Mill), per mine for Paladin and Boss, and at company level where only a consolidated figure exists. A company total uses one level only, the operation rows when every listed operation reported, otherwise the company-level row, never both.
Verification
Every seed row carries verified = true with the verifier and date: each figure was copied from the cited document with a verbatim quote, machine-checked against the document at curation and re-checked against every cited document on 9 October 2026. The unverified badge therefore marks only rows captured automatically from a new filing by the extraction pipeline, which display at once and wait for a second look on the admin page.

See the site-wide methodology for provenance labels and the other datasets.

Cite this page

Using our data in an article or report? Please credit Yellowcake Analytics with a link.

Citation

Yellowcake Analytics. "Uranium Production by Company and Operation." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/production.

HTML (with link)

<a href="https://www.yellowcakeanalytics.com/production">Uranium Production by Company and Operation</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)

The weekly uranium brief

Spot moves, SPUT flows, filings, and contract news, once a week. Plus a free daily CSV of our uranium equity screener snapshot.

Free forever. One email a week + a daily data CSV. By subscribing you agree to receive marketing email from Yellowcake Analytics (privacy policy). Unsubscribe anytime.