Quarterly dried and drummed U3O8 per producer and per operation, copied from each company's own quarterly report with the wording, the ownership basis and a link to the document. Upstream stages (ore mined, loaded on resin, precipitated) sit beside the headline, labelled, and are never substituted for it. The one exception, a company that publishes only a combined figure spanning both (badged combined), is declared per company. Guidance stays in the guidance tracker; this page shows year-to-date attainment against it where the basis matches. How the stages differ →
Latest reported production
AttributableDried and drummed U3O8, company share, latest period on record| Company | Status | Period | Production, Mlb U3O8 | Guidance attainment | Source |
|---|---|---|---|---|---|
| Kazatomprom JSCNATKYtables ↓ | Producing | three months ended September 30, 2026 | 10.18unverified | — | source |
| Cameco CorporationCCJtables ↓ | Producing | three months ended September 30, 2026 | 3.50unverified | — | source |
| Energy Fuels IncUUUUtables ↓ | Producing | nine months ended September 30, 2026 | 1.66unverified | — | source |
| Paladin Energy LtdPALAFtables ↓ | Producing | Q1 FY2027 | 0.750derived | — | source |
| Boss Energy LtdBQSSFtables ↓ | Ramp-up | Q1 FY2027 | 0.359unverified | — | source |
| Ur-Energy IncURGtables ↓ | Producing | Q3 2026 | 0.105unverified | — | source |
| Lotus Resources LtdLTSRFtables ↓ | Restart | three months ended September 30, 2026 | 0.087unverifiedderived | — | source |
| Uranium Energy CorpUECtables ↓ | Restart | fourth quarter of Fiscal 2026 (first full quarter of operation; May 1 to July 31, 2026) (sum of 2 operations) | 0.083combined | — | source |
| Peninsula Energy LtdPENMFtables ↓ | Ramp-up | Q1 FY2027 | 0.016unverified | — | source |
| enCore Energy CorpEUtables ↓ | Producing | latest on record 30 Jun 2026stale | Not disclosed | — | |
| Western Uranium & Vanadium CorpWSTRF | Restart | No production disclosed for the latest expected period. | |||
Not disclosed means the company did not publish a dried and drummed figure for the period; no upstream stage is substituted. Badges: unverified (captured automatically from a new filing, waiting for a second look), combined (the company reports one figure spanning dried and drummed and the stage before it, note on hover), derived (a share below 100% applied to a reported figure, or a sum the company did not state, note on hover), revised (supersedes an earlier row), stale (a newer report should exist for the company's cadence).
By company and operation 10 companies
Each company is collapsed; open it for the period-by-period tables, or use Expand all. Operation rows are on the 100% basis; company-level rows are the company's share. Dried and drummed is in bold. Hover a figure for the company's wording and unit; click it to open the document. The derived line under a company name (utilization of nameplate, pounds in circuit, implied recovery) is computed from the reported rows at read time and badged derived; hover for the derivation.
Kazatomprom JSCNATKYProducing10.18 Mlbunverified three months ended September 30, 2026Company level only, 8 periods
| Period | Dried and drummedMlb U3O8, attributable | Sold (may include purchased material)Mlb U3O8, attributable | Source |
|---|---|---|---|
| three months ended September 30, 2026 | 10.18unverified | 16.75unverified | source |
| three months ended 30 June 2026 | 9.90 | 15.73 | source |
| three months ended 31 March 2026 | 8.44 | 3.99 | source |
| three months ended 31 December 2025 | 9.64 | 14.87 | source |
| year ended 31 December 2025full year | 35.15 | 48.08revised | source |
| three months ended 30 September 2025 | 8.77 | 13.39 | source |
| three months ended 30 June 2025 | 9.01 | 13.17 | source |
| three months ended 31 March 2025 | 7.71revised | 6.66 | source |
Cameco CorporationCCJProducing3.50 Mlbunverified three months ended September 30, 2026Company and 3 operations, 28 periods
| Period | Dried and drummedMlb U3O8, attributable | Sold (may include purchased material)Mlb U3O8, attributable | Source |
|---|---|---|---|
| three months ended September 30, 2026 | 3.50unverified | 5.60unverified | source |
| three months ended June 30, 2026 | 3.90 | 7.10 | source |
| three months ended March 31, 2026 | 6.20 | 7.80 | source |
| three months ended December 31, 2025 | 6.00 | 11.20 | source |
| year ended December 31, 2025full year | 21.00 | 33.00 | source |
| three months ended September 30, 2025 | 4.40 | 6.10 | source |
| three months ended June 30, 2025 | 4.60 | 8.70 | source |
| three months ended March 31, 2025 | 6.00 | 6.90 | source |
| Period | Dried and drummedMlb U3O8, 100% basis | Source |
|---|---|---|
| second quarter of 2026 (the quarter) | 2.80 | source |
| first quarter of 2026 (the quarter) | 2.50 | source |
| 2025full year | 8.40 | source |
| third quarter of 2025 (the quarter) | 2.40 | source |
| second quarter of 2025 (the quarter) | 2.30 | source |
| three months ended March 31, 2025 (the quarter) | 1.10 | source |
Energy Fuels IncUUUUProducing1.66 Mlbunverified nine months ended September 30, 2026Company and 2 operations, 16 periods
| Period | Sold (may include purchased material)Mlb U3O8, attributable | Source |
|---|---|---|
| three months ended June 30, 2026 | 0.310derived | source |
| three months ended March 31, 2026 | 0.510derived | source |
| year ended December 31, 2025full year | 0.650 | source |
| Q3-2025 | 0.240 | source |
| three and six months ended June 30, 2025 | 0.050 | source |
| three months ended March 31, 2025 | 0.000 | source |
Paladin Energy LtdPALAFProducing0.750 Mlbderived Q1 FY20271 operation, 9 periods
| Period | Dried and drummedMlb U3O8, 100% basis | Sold (may include purchased material)Mlb U3O8, 100% basis | Source |
|---|---|---|---|
| Q1 FY2027 | 1.00 | 1.16 | source |
| Q4 FY2026 (quarter ended 30 June 2026) | 1.23 | 1.35 | source |
| FY2026 (year ended 30 June 2026)full year | 4.82 | 4.35 | source |
| Q3 FY2026 (quarter ended 31 March 2026) | 1.29 | 1.03 | source |
| Q2 FY2026 (quarter ended 31 December 2025) | 1.23 | 1.43 | source |
| Q1 FY2026 (quarter ended 30 September 2025) | 1.07 | 0.534 | source |
| Q4 FY2025 (quarter ended 30 June 2025) | 0.994 | 0.710 | source |
| FY2025 (year ended 30 June 2025)full year | 3.02 | 2.71 | source |
| Q3 FY2025 (quarter ended 31 March 2025) | 0.745 | 0.872 | source |
Boss Energy LtdBQSSFRamp-up0.359 Mlbunverified Q1 FY2027Company and 2 operations, 26 periods
| Period | Sold (may include purchased material)Mlb U3O8, attributable | Source |
|---|---|---|
| Q1 FY2027 | 0.301unverified | source |
| Q4 FY26 (June 2026 quarter) | 0.325 | source |
| FY26 (year ended 30 June 2026)full year | 1.40 | source |
| Q3 FY26 (March 2026 quarter) | 0.325 | source |
| Q2 FY26 (December 2025 quarter) | 0.350 | source |
| Q1 FY26 (September 2025 quarter) | 0.400 | source |
| Q4 FY25 (June 2025 quarter) | 0.100 | source |
| FY25 Total (year ended 30 June 2025)full year | 0.650 | source |
| March Q3 FY25 (March 2025 quarter) | 0.150 | source |
| Period | Dried and drummedMlb U3O8, 100% basis | Loaded on resinMlb U3O8, 100% basis | Source |
|---|---|---|---|
| Q1 FY2027 | 0.010unverified | — | source |
| Q4 FY26 (June 2026 quarter) | 0.045 | — | source |
| FY26 (year ended 30 June 2026)full year | 0.491 | — | source |
| Q3 FY26 (March 2026 quarter) | 0.097 | — | source |
| Q2 FY26 (December 2025 quarter) | 0.143 | — | source |
| Q1 FY26 (September 2025 quarter) | 0.206 | — | source |
| Q4 FY25 (June 2025 quarter) - restated on drummed basis | 0.180 | 0.204 | source |
| March Q3 FY25 (March 2025 quarter) | — | 0.098 | source |
| Period | Dried and drummedMlb U3O8, 100% basis | Loaded on resinMlb U3O8, 100% basis | Source |
|---|---|---|---|
| Q1 FY2027 | 0.359unverified | 0.337unverified | source |
| Q4 FY26 (June 2026 quarter) | 0.362 | 0.371 | source |
| FY26 (year ended 30 June 2026)full year | 1.41 | 1.37 | source |
| Q3 FY26 (March 2026 quarter) | 0.203 | 0.221 | source |
| Q2 FY26 (December 2025 quarter) | 0.456 | 0.406 | source |
| Q1 FY26 (September 2025 quarter) | 0.386 | 0.376 | source |
| Q4 FY25 (June 2025 quarter) | 0.349 | 0.396 | source |
| FY25 Total (year ended 30 June 2025)full year | 0.872 | 0.969 | source |
| March Q3 FY25 (March 2025 quarter) | 0.296 | 0.247 | source |
Ur-Energy IncURGProducing0.105 Mlbunverified Q3 2026Company and 2 operations, 26 periods
| Period | Sold (may include purchased material)Mlb U3O8, attributable | Source |
|---|---|---|
| Q3 2026 | 0.190unverified | source |
| 2026 Q2 | 0.215 | source |
| 2026 Q1 | 0.055 | source |
| 2025 Q4 | 0.165 | source |
| 2025 (fiscal year ended December 31, 2025)full year | 0.440 | source |
| 2025 Q3 | 0.110 | source |
| 2025 Q2 | 0.165 | source |
| 2025 Q1 | 0.000 | source |
| Q4 2024 | 0.395unverified | source |
| year ended December 31, 2024full year | 0.570unverified | source |
| Q3 2024 | 0.100unverified | source |
| Q2 2024 | 0.075unverified | source |
| Period | Dried and drummedMlb U3O8, 100% basis | Loaded on resinMlb U3O8, 100% basis | ShippedMlb U3O8, 100% basis | Source |
|---|---|---|---|---|
| Q3 2026 | 0.105unverified | 0.155unverified | 0.075unverified | source |
| 2026 Q2 | 0.141 | 0.105unverified | 0.150 | source |
| 2026 Q1 | 0.096 | 0.110 | 0.104 | source |
| 2025 Q4 | 0.122 | 0.078 | 0.138 | source |
| 2025 (fiscal year ended December 31, 2025)full year | 0.410 | 0.371 | 0.420 | source |
| 2025 Q3 | 0.094 | 0.089 | 0.070 | source |
| 2025 Q2 | 0.112 | 0.129 | 0.105 | source |
| 2025 Q1 | 0.083 | 0.074 | 0.106 | source |
| Q4 2024 | — | 0.082unverified | 0.067unverified | source |
| year ended December 31, 2024full year | — | 0.266unverified | 0.240unverified | source |
| Q3 2024 | — | 0.075unverified | 0.067unverified | source |
| Q2 2024 | — | 0.071unverified | 0.070unverified | source |
| Q1 2024 | — | 0.038unverified | 0.035unverified | source |
Lotus Resources LtdLTSRFRestart0.087 Mlbunverifiedderived three months ended September 30, 20261 operation, 6 periods
| Period | Dried and drummedMlb U3O8, 100% basis | Source |
|---|---|---|
| three months ended September 30, 2026 | 0.102unverified | source |
| June 2026 Quarter | 0.156 | source |
| FY2026 (year ended 30 June 2026)full year | 0.332 | source |
| March 2026 Quarter (restated) | 0.078revised | source |
| Dec 2025 Quarter (restated) | 0.072revised | source |
| Sept 2025 Quarter | 0.025 | source |
Uranium Energy CorpUECRestart0.083 Mlbcombined fourth quarter of Fiscal 2026 (first full quarter of operation; May 1 to July 31, 2026) (sum of 2 operations)Company and 3 operations, 13 periods
| Period | Sold (may include purchased material)Mlb U3O8, attributable | Source |
|---|---|---|
| Fiscal 2026 (fiscal year ended July 31, 2026)full year | 0.400 | source |
| second quarter of Fiscal 2026 (three months ended January 31, 2026) | 0.200 | source |
| Fiscal 2025 (fiscal year ended July 31, 2025)full year | 0.810 | source |
| second quarter of Fiscal 2025 (three months ended January 31, 2025) | 0.600 | source |
| Period | PrecipitatedMlb U3O8, 100% basis | Source |
|---|---|---|
| fourth quarter of Fiscal 2026 (May 1 to July 31, 2026) | 0.065 | source |
| Fiscal 2026 (fiscal year ended July 31, 2026)full year | 0.212 | source |
| third fiscal quarter of 2026 (three months ended April 30, 2026) | 0.032 | source |
| second fiscal quarter of 2026 (three months ended January 31, 2026) | 0.046 | source |
| three months ended October 31, 2025 (first quarter of Fiscal 2026) | 0.069 | source |
| Fiscal 2025full year | 0.104 | source |
Peninsula Energy LtdPENMFRamp-up0.016 Mlbunverified Q1 FY2027Company and 1 operation, 11 periods
| Period | Dried and drummedMlb U3O8, 100% basis | Loaded on resinMlb U3O8, 100% basis | ShippedMlb U3O8, 100% basis | Sold (may include purchased material)Mlb U3O8, 100% basis | Source |
|---|---|---|---|---|---|
| Q1 FY2027 | 0.016unverified | 0.018unverified | — | — | source |
| 4Q26 Jun-26 (June Quarter, quarter ended 30 June 2026) | 0.011 | 0.014 | 0.011 | 0.010 | source |
| YTD FY26 (financial year 1 July 2025 to 30 June 2026; full FY26)full year | 0.017 | 0.025 | — | — | source |
| 3Q26 Mar-26 (quarter ended 31 March 2026) | 0.002 | 0.004 | — | — | source |
| 2Q26 Dec-25 (quarter ended 31 December 2025) | 0.003 | 0.007 | — | — | source |
| 1Q26 Sep-25 (quarter ended 30 September 2025) | 0.001revised | 0.000 | — | — | source |
| June 2025 quarter (quarter ended 30 June 2025; company fiscal label 4Q25) | — | 0.000 | — | — | source |
| FY25 (financial year ended 30 June 2025)full year | — | 0.007revised | — | — | source |
| March quarter (quarter ended 31 March 2025; company fiscal label 3Q25) | — | 0.006 | — | — | source |
enCore Energy CorpEUProducingNot disclosedstaleCompany and 2 operations, 8 periods
| Period | Sold (may include purchased material)Mlb U3O8, attributable | Source |
|---|---|---|
| Three Months Ended June 30, 2026 | 0.215 | source |
| Three Months Ended March 31, 2026 | 0.270 | source |
| Year Ended December 31, 2025full year | 0.655 | source |
| Three Months Ended September 30, 2025 | 0.130 | source |
| Three Months Ended June 30, 2025 | 0.060 | source |
| Three Months Ended March 31, 2025 | 0.290 | source |
Methodology
- What counts as production
- Production on this site means dried and drummed (packaged) U3O8: finished product ready for delivery to a converter or customer. It is the stage the U.S. EIA uses for uranium concentrate output and the only stage comparable between in-situ recovery and conventional producers. When a company does not disclose drummed production for a period, the headline reads Not disclosed. No upstream stage is ever substituted for it. One declared exception: when a company reports only a single combined figure that includes dried and drummed U3O8 together with the stage before it, and no separate drummed figure (Uranium Energy Corp since Fiscal 2026 reports "precipitated uranium and dried and drummed U3O8"), that combined figure is its headline, labelled as combined, because it is the company's own production measure and the alternative would be a figure from an earlier year.
- Stages
- Each figure is stored under the stage the company reported, with the company's own wording kept verbatim: ore mined (contained pounds in ore extracted), ore stockpiled, ore milled, loaded on resin (uranium captured on ion-exchange resin), precipitated (eluted and precipitated as slurry or wet cake), dried and drummed (the headline), shipped (delivered to a converter or customer) and sold. Sold pounds may include purchased material, so sales are never read as production. Figures are never summed across stages.
- 100% basis and attributable
- A 100% basis figure is the operation's total output; an attributable figure is the company's share. Operation pages and operation rows show 100% basis; company pages and every cross-company total use the attributable basis, because adding 100% figures across joint-venture partners would count Inkai, Cigar Lake and McArthur River twice. Where a company reports only one basis and its ownership share is cited on the operation, the other basis is derived by applying that share and carries a derived badge with the note. Cameco's share of JV Inkai is a purchase entitlement that differs from its 40% interest, so it is never derived.
- Guidance and attainment
- Annual production guidance stays in the guidance tracker, with its revisions and withdrawals. Where quarterly drummed production exists on the same basis as a company's guidance window, the hub shows year-to-date production against the guided range and as a share of the range midpoint, labelled as the midpoint. Guidance on a different basis or in a different unit is not compared.
- Sources, verification and revisions
- Every figure is copied from a company document: a quarterly MD&A or 10-Q, an ASX quarterly activities report or a results release, with the document URL, publication date, location and a verbatim quote. Figures appear as soon as they are entered; rows that have not yet been checked a second time carry an unverified badge. A revised figure is stored as a new row that supersedes the old one, which is kept, and the revised badge shows the chain.
- Units and reporting periods
- Figures are kept in the unit the company used and normalised to pounds of U3O8 through one shared conversion module: pounds, thousand pounds and million pounds are exact scale changes; kilograms and tonnes of U3O8 use 2.204623 lb per kg; tonnes of uranium metal use the U3O8 mass fraction of 0.848 from the same module. Every row carries real calendar dates, so a June-year reporter such as Paladin or Boss aligns with a calendar-year reporter by date overlap, never by label.
- Granularity by company
- Data is stored at the most granular level each company reports: per operation for Cameco, per mill facility for Energy Fuels (finished U3O8 is produced at the White Mesa Mill), per mine for Paladin and Boss, and at company level where only a consolidated figure exists. A company total uses one level only, the operation rows when every listed operation reported, otherwise the company-level row, never both.
- Verification
- Every seed row carries verified = true with the verifier and date: each figure was copied from the cited document with a verbatim quote, machine-checked against the document at curation and re-checked against every cited document on 9 October 2026. The unverified badge therefore marks only rows captured automatically from a new filing by the extraction pipeline, which display at once and wait for a second look on the admin page.
See the site-wide methodology for provenance labels and the other datasets.
Cite this page
Using our data in an article or report? Please credit Yellowcake Analytics with a link.
Yellowcake Analytics. "Uranium Production by Company and Operation." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/production.
<a href="https://www.yellowcakeanalytics.com/production">Uranium Production by Company and Operation</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)
The weekly uranium brief
Spot moves, SPUT flows, filings, and contract news, once a week. Plus a free daily CSV of our uranium equity screener snapshot.