Sites / USA
Alta Mesa Central Processing Plant
Uranium mill / processing plant · Texas (Brooks County), USA · operated by enCore Energy Corp (EU)
Status
Operating
Deposit type
ISR central processing plant
Mining method
ISR processing plant
Targeted restart
2024
Published figures
curated| Deposit type | ISR central processing plant | source |
| Mining method | ISR processing plant | source |
| Targeted restart | 2024 | source |
| Ownership | enCore Energy (70%), Boss Energy (30%) | source |
| Feeds from | Alta Mesa | source |
On the Alta Mesa project area near Encino; 2.0 Mlb U3O8/yr design capacity with 1.5 Mlb/yr of ion-exchange recovery; TCEQ radioactive material licence R05360; extraction commenced June 2024 (enCore S-K 1300 technical report summary, effective December 31, 2024). enCore is the managing operator and 70% owner; Boss Energy holds 30% (Boss Energy ASX release, 26 August 2025). Coordinates per the technical report (26°54′08″N 98°18′54″W).
Coordinates are approximate. Figures are curated from company filings, technical reports and the World Nuclear Association, with a citation and a provenance badge per figure; unsourced values are flagged, not hidden. Informational only, not investment advice.
Cite this page
Using our data in an article or report? Please credit Yellowcake Analytics with a link.
Yellowcake Analytics. "Alta Mesa Central Processing Plant — Uranium Mine Profile." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/sites/alta-mesa-central-processing-plant.
<a href="https://www.yellowcakeanalytics.com/sites/alta-mesa-central-processing-plant">Alta Mesa Central Processing Plant — Uranium Mine Profile</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)