Status
Operating
Production (2024, annual, WNA)
6,501 tU
Resources
215 Mlbs U₃O₈
Grade
14.7% U₃O₈
Published figures
curated| Production (2024, annual, WNA) | 6,501 tU | source |
| Resources | 215 Mlbs U₃O₈ | source |
| Grade | 14.7% U₃O₈ | source |
| Cash cost | $17/lb | source |
| Deposit type | Unconformity | source |
| Mining method | Jet Boring / Freeze Wall | source |
| Processed at | McClean Lake Mill | source |
Quarterly production (100% basis)
100% basisDried and drummed U3O8 is the production figure; upstream stages are labelled and never substituted. Hover a figure for the company's wording and unit; click it to open the document. The annual tU figure above is the WNA mining table, a different measure. Sector-wide tracker →
Second-largest producer in the WNA 2024 table (6,501 tU); ore milled at McClean Lake.
Coordinates are approximate. Figures are curated from company filings, technical reports and the World Nuclear Association, with a citation and a provenance badge per figure; unsourced values are flagged, not hidden. Informational only, not investment advice.
Cite this page
Using our data in an article or report? Please credit Yellowcake Analytics with a link.
Yellowcake Analytics. "Cigar Lake — Uranium Mine Profile." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/sites/cigar-lake.
<a href="https://www.yellowcakeanalytics.com/sites/cigar-lake">Cigar Lake — Uranium Mine Profile</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)