Sites / Australia
Honeymoon ISR Mine
Uranium mine · South Australia, Australia · operated by Boss Energy Ltd (BQSSF)
Status
Operating
Resources
71 Mlbs U₃O₈
Grade
0.06% U₃O₈
AISC
$41/lb
Published figures
curated| Resources | 71 Mlbs U₃O₈ | source |
| Grade | 0.06% U₃O₈ | source |
| AISC | $41/lb | source |
| Deposit type | Sandstone (ISR) | source |
| Mining method | ISR | source |
| Targeted restart | 2024 | source |
Quarterly production (100% basis)
100% basisDried and drummed U3O8 is the production figure; upstream stages are labelled and never substituted. Hover a figure for the company's wording and unit; click it to open the document. The annual tU figure above is the WNA mining table, a different measure. Sector-wide tracker →
| Period | Dried and drummedMlb U3O8, 100% basis | Loaded on resinMlb U3O8, 100% basis | Source |
|---|---|---|---|
| Q1 FY2027 | 0.359unverified | 0.337unverified | source |
| Q4 FY26 (June 2026 quarter) | 0.362 | 0.371 | source |
| Q3 FY26 (March 2026 quarter) | 0.203 | 0.221 | source |
| Q2 FY26 (December 2025 quarter) | 0.456 | 0.406 | source |
| Q1 FY26 (September 2025 quarter) | 0.386 | 0.376 | source |
| Q4 FY25 (June 2025 quarter) | 0.349 | 0.396 | source |
| March Q3 FY25 (March 2025 quarter) | 0.296 | 0.247 | source |
Restarted in 2024
Coordinates are approximate. Figures are curated from company filings, technical reports and the World Nuclear Association, with a citation and a provenance badge per figure; unsourced values are flagged, not hidden. Informational only, not investment advice.
Cite this page
Using our data in an article or report? Please credit Yellowcake Analytics with a link.
Yellowcake Analytics. "Honeymoon ISR Mine — Uranium Mine Profile." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/sites/honeymoon-isr-mine.
<a href="https://www.yellowcakeanalytics.com/sites/honeymoon-isr-mine">Honeymoon ISR Mine — Uranium Mine Profile</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)