U₃O₈90.27-2.47%FUTURESmodeled

Sites / Malawi

Kayelekera Mine

Uranium mine · Northern Region, Malawi · operated by Lotus Resources Ltd (LTSRF)

Status

Operating

Resources

51 Mlbs U₃O₈

Grade

0.047% U₃O₈

FS cost

$45/lb

Published figures

curated
Resources51 Mlbs U₃O₈source
Grade0.047% U₃O₈source
FS cost$45/lbsource
Deposit typeSandstonesource
Mining methodConventional Open Pitsource
Targeted restart2025source

Quarterly production (100% basis)

100% basis
Real

Dried and drummed U3O8 is the production figure; upstream stages are labelled and never substituted. Hover a figure for the company's wording and unit; click it to open the document. The annual tU figure above is the WNA mining table, a different measure. Sector-wide tracker →

PeriodDried and drummedMlb U3O8, 100% basisSource
three months ended September 30, 20260.102unverifiedsource
June 2026 Quarter0.156source
March 2026 Quarter (restated)0.078revisedsource
Dec 2025 Quarter (restated)0.072revisedsource
Sept 2025 Quarter0.025source

Restarted under Lotus: first yellowcake drummed late August 2025; production paused June 10 to August 12, 2026 for an acid-supply disruption and acid-plant repairs, then resumed. June 2026 quarter output 155.9 klb U3O8 (332.1 klb cumulative since restart). Previously operated by Paladin Energy.

Coordinates are approximate. Figures are curated from company filings, technical reports and the World Nuclear Association, with a citation and a provenance badge per figure; unsourced values are flagged, not hidden. Informational only, not investment advice.

Cite this page

Using our data in an article or report? Please credit Yellowcake Analytics with a link.

Citation

Yellowcake Analytics. "Kayelekera Mine — Uranium Mine Profile." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/sites/kayelekera-mine.

HTML (with link)

<a href="https://www.yellowcakeanalytics.com/sites/kayelekera-mine">Kayelekera Mine — Uranium Mine Profile</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)