U₃O₈––.––FUTURESmodeled

Sites / Namibia

Langer Heinrich Mine

Uranium mine / mill · Erongo, Namibia · operated by Paladin Energy Ltd (PALAF)

Status

Operating

Resources

84 Mlbs U₃O₈

Grade

0.045% U₃O₈

AISC

$32/lb

Published figures

Estimated
Resources84 Mlbs U₃O₈source
Grade0.045% U₃O₈source
AISC$32/lbsource
Deposit typeCalcretesource
Mining methodConventional Open Pitunsourced
Targeted restart2024source

Quarterly production (100% basis)

100% basis
Real

Dried and drummed U3O8 is the production figure; upstream stages are labelled and never substituted. Hover a figure for the company's wording and unit; click it to open the document. The annual tU figure above is the WNA mining table, a different measure. Sector-wide tracker →

PeriodDried and drummedMlb U3O8, 100% basisSold (may include purchased material)Mlb U3O8, 100% basisSource
Q4 FY2026 (quarter ended 30 June 2026)1.23unverified1.35unverifiedsource
Q3 FY2026 (quarter ended 31 March 2026)1.29unverified1.03unverifiedsource
Q2 FY2026 (quarter ended 31 December 2025)1.23unverified1.43unverifiedsource
Q1 FY20261.07unverifiedrevised0.53unverifiedrevisedsource
Q4 FY2025 (quarter ended 30 June 2025)0.99unverified0.71unverifiedsource
Q3 FY2025 (quarter ended 31 March 2025)0.75unverified0.87unverifiedsource

Restarted in 2024

Coordinates are approximate. Figures are curated from company filings, technical reports and the World Nuclear Association, with a citation per figure; unsourced values are flagged, not hidden. Informational only — not investment advice.

Cite this page

Using our data in an article or report? Please credit Yellowcake Analytics with a link.

Citation

Yellowcake Analytics. "Langer Heinrich Mine — Uranium Mine Profile." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/sites/langer-heinrich-mine.

HTML (with link)

<a href="https://www.yellowcakeanalytics.com/sites/langer-heinrich-mine">Langer Heinrich Mine — Uranium Mine Profile</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)