Status
Operating
Resources
20 Mlbs U₃O₈
Grade
0.7% U₃O₈
Cash cost
$23/lb
Published figures
curated| Resources | 20 Mlbs U₃O₈ | source |
| Grade | 0.7% U₃O₈ | source |
| Cash cost | $23/lb | source |
| Deposit type | Breccia pipe / Mill | source |
| Mining method | Conventional Underground | source |
| Processed at | White Mesa Mill | source |
Quarterly production (100% basis)
100% basisDried and drummed U3O8 is the production figure; upstream stages are labelled and never substituted. Hover a figure for the company's wording and unit; click it to open the document. The annual tU figure above is the WNA mining table, a different measure. Sector-wide tracker →
Coordinates are approximate. Figures are curated from company filings, technical reports and the World Nuclear Association, with a citation and a provenance badge per figure; unsourced values are flagged, not hidden. Informational only, not investment advice.
Cite this page
Using our data in an article or report? Please credit Yellowcake Analytics with a link.
Yellowcake Analytics. "Pinyon Plain — Uranium Mine Profile." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/sites/pinyon-plain.
<a href="https://www.yellowcakeanalytics.com/sites/pinyon-plain">Pinyon Plain — Uranium Mine Profile</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)