About 70 percent of tellurium goes into cadmium telluride thin-film solar panels. The rest is used in thermoelectric coolers and generators, as an additive that makes steel and copper easier to machine, and in infrared detectors and other specialty products.

Tellurium (Te) · Semiconductor and byproduct metals · data as of

On the proposed stockpile purchase list1 domestic project in federal permitting

U.S. net import reliance

>25%

USGS publishes ranges only: greater than 25 percent in 2025 (estimate), less than 25 percent in 2024, net exporter in 2023, greater than 75 percent in 2022, greater than 95 percent in 2021.

Real

Top mining country

—

Byproduct: not mined on its own.

Top processing country

China 80%

refinery production, 2025

Real

Top U.S. import source

Canada 64%

tellurium metal, 2021-2024

Real

Direct dependency

—

Needs a published reliance figure and an import split.

Where it is mined, processed and imported from

Each column is one stage, split by country share. Ribbons run through a neutral pool because the sources do not publish how much of one country’s output went to which processor. Import shares record the shipping country, not the origin, and material inside finished goods is not counted. A dashed outline marks a figure from a thinner source or one not rechecked. Select a country to follow it across the stages.

U.S. net import reliance: >25%

  • Allies
  • China
  • Other restricted countries
  • Rest of world
  • Other, grouped
  • Not published

Mining

Byproduct: not mined on its own

Processing

refinery production, 2025

  • China80%
  • Russia6.7%
  • Japan6.1%
  • Other countries (4 named, smaller shares)5.2%
  • Not published2%

U.S. imports

tellurium metal, 2021-2024

  • CanadaTraced to Partly United States (Rio Tinto's Kennecott copper operation, Utah); other feed not published64%
  • Philippines14%
  • Japan8%
  • Germany5%
  • Other countries9%

U.S. supply

net import reliance

Import reliance >25%

Byproduct. Tellurium is recovered mainly from anode slimes produced in electrolytic copper refining, with minor amounts from lead, nickel, platinum-group and zinc processing. No mine production by country is published.

Who has called it a bottleneck

Public statements by the military, agencies and manufacturers, paraphrased. Check the linked source before quoting one.

  • First Solar, Inc.

    Manufacturerexplicit

    First Solar warns that tellurium and cadmium telluride come from one or very few suppliers, and that the licences Chinese exporters have needed since February 2025 can be slow, costly or unobtainable, which could raise costs or delay module production.

    Source
  • U.S. Geological Survey

    Agencyexplicit

    USGS reports that Chinese end-user verification and licensing, in force since February 2025 and typically taking 45 days, sharply curtailed supply to Europe and pushed European tellurium prices up an estimated 84 percent in 2025.

    Source

The figures and their sources

Every row in the dataset for tellurium, with its year and source. Real means the source publishes the figure. Estimated means the share was computed from published tonnages.

Mining

Byproduct. Tellurium is recovered mainly from anode slimes produced in electrolytic copper refining, with minor amounts from lead, nickel, platinum-group and zinc processing. No mine production by country is published.

Processing and refining

Stage: refinery production

CountryShareQuantityYearLabelSource
China80%800 metric tons2025Real
Russia6.7%67 metric tons2025Estimated
Japan6.1%61 metric tons2025Estimated
Canada2.8%28 metric tons2025Estimated
Uzbekistan1.8%18 metric tons2025Estimated
South Africa0.5%5 metric tons2025Estimated
Bulgaria0.1%1 metric tons2025Estimated
World totalrefinery production (rounded; excludes withheld U.S. output)100%1,000 metric tons2025Real

Stage: tellurium contained in concentrate

CountryShareQuantityYearLabelSource
Sweden4.8%48 metric tons2025Estimated

Stage: copper telluride produced at copper refineries

CountryShareQuantityYearLabelSource
United Statescopper telluride produced at copper refineries (quantity withheld by USGS)——2025Real

U.S. imports

Form: tellurium metal

CountryShareQuantityYearLabelSource
Canada64%—2021-2024Real
Philippines14%—2021-2024Real
Japan8%—2021-2024Real
Germany5%—2021-2024Real
Other9%—2021-2024Real

U.S. production and consumption

Domestic production
Copper telluride is produced as a byproduct of domestic copper refining; the quantity is withheld to protect company data. (MCS 2026)
Apparent consumption
Withheld. Imports for consumption 6 metric tons (2024) and an estimated 14 metric tons (2025); exports 3 metric tons in each year. (MCS 2026)

Confidence and notes on the figures

Medium: some figures are derived, come from secondary sources, or cover different years.

USGS states China was 80 percent of 2025 world refinery production; other shares are derived against the rounded 1,000 metric ton world total (listed countries sum to 1,028 metric tons, so shares are approximate). The world total excludes U.S. output, which is withheld. The 2024 values are recorded as China 750, Japan 70, Russia 64, Sweden 46, Canada 27, Uzbekistan 18, South Africa 5, Bulgaria 1 and world about 981 metric tons; the 2024 world total and the Sweden figure are uncertain readings of the USGS table and are not confirmed. Estimated 2025 capacity is China 1,000, Russia 80, Japan 75, Sweden 50, Uzbekistan 50, Canada 30, South Africa 10, Bulgaria 5 and world 1,300 metric tons. U.S. imports are small (6 to 42 metric tons per year) and come mainly from Canada, so direct U.S. exposure to China is through global price and availability rather than bilateral trade. Net import reliance swung from above 95 percent (2021) to net exporter (2023) and back above 25 percent (2025). The U.S. warehouse price rose about 60 percent in 2025 to an estimated $120 per kilogram.

Where the imports come from originally

Import sources traced back to where the material was mined or first processed. Most traces are qualitative.

U.S. import sourceShare of importsWhere the material comes fromBasisSource
Canada64%Partly United States (Rio Tinto's Kennecott copper operation, Utah); other feed not published5N Plus refines tellurium from Kennecott under a supply deal; other Canadian refinery sources not traced.qualitativemedium confidenceSource

Government action

Stockpile plan, proposed fiscal 2026

as of . Proposed plan published August 2024. Quantities are maximums, not commitments. No final fiscal 2026 or 2027 plan has been published. Federal Register

ActionMaterialMaximum quantityMinerals on this list
acquisitionCadmium Zinc Tellurium2,800 cm2Tellurium, Zinc

Domestic projects in federal permitting

as of . Federal Permitting Council transparency list as last updated 2 April 2026. It includes gold and copper projects that are not scarce-mineral stories. Permitting Council list

ProjectStateTypeMinerals on this list
Bend ProjectWisconsinexploration drilling (also gold)Copper, Tellurium

Sources

Method, known gaps and file downloads are on the critical minerals overview. This page is informational and is not investment advice.

Cite this page

Using our data in an article or report? Please credit Yellowcake Analytics with a link.

Citation

Yellowcake Analytics. "Tellurium Supply Chain." Yellowcake Analytics, 2026, https://www.yellowcakeanalytics.com/critical-minerals/tellurium.

HTML (with link)

<a href="https://www.yellowcakeanalytics.com/critical-minerals/tellurium">Tellurium Supply Chain</a> — Yellowcake Analytics (www.yellowcakeanalytics.com)

The weekly uranium brief

Spot moves, SPUT flows, filings, and contract news, once a week. Plus a free daily CSV of our uranium equity screener snapshot.

Free forever. One email a week + a daily data CSV. By subscribing you agree to receive marketing email from Yellowcake Analytics (privacy policy). Unsubscribe anytime.