How much does it cost to mine uranium?
60-second answer: Operating uranium mines that publish a unit cost report between $16.96 and $43.30 per pound of U₃O₈, mostly as cash costs, per issuer filings compiled on our cost curve (rows curated October 30, 2026). The capacity-weighted median is $28.38/lb across mixed cost bases. Cash costs leave out capital and other charges, so all-in costs run higher. Spot was $90.02/lb on November 20, 2026.
The range today
Not every miner discloses a cost per pound, so start with what is published. Of the 29 operations on our cost curve list:
- 17 have an issuer-stated cost per pound.
- 12 of those 17 are operating; 5 are development projects quoting feasibility-study costs.
- Of the 12 operating, 8 report a cash cost, 2 report all-in sustaining cost (AISC) and 2 carry only a study or restart-plan figure.
- 12 operations publish no unit cost at all, including Husab, Rössing, Olympic Dam and Inkai.
By capacity, the curve covers 86% of tracked production capacity: 110.7 of 128.4 million lb a year (our cost curve, November 17, 2026). The missing 14% is mostly large operations whose owners do not report unit costs, so the true industry distribution could sit higher or lower than the disclosed one.
Costs by operating mine
| Operation (owner) | Method | US$/lb | Basis | Period |
|---|---|---|---|---|
| Cigar Lake and McArthur River (Cameco) | Underground | 16.96 | Cash cost, company-wide (C$23.74) | FY2025 |
| Pinyon Plain (Energy Fuels) | Underground | 23.00 | Cash cost, mill run | Q4 2025 to Q2 2026 |
| Christensen Ranch (Uranium Energy Corp) | ISR | 28.38 | Cash cost | Quarter to July 31, 2026 |
| Burke Hollow (Uranium Energy Corp) | ISR | 36.13 | Cash cost | Quarter to July 31, 2026 |
| Kazakh ISR mines (Kazatomprom) | ISR | 38.45 | AISC, attributable | 1H2026 |
| Alta Mesa (enCore Energy) | ISR | 38.46 | Cash cost, company-wide | Six months to June 30, 2026 |
| Lost Creek (Ur-Energy) | ISR | 40.20 | Cash cost per lb sold | Q2 2026 |
| Honeymoon (Boss Energy) | ISR | 41.00 | AISC (A$61.00) | FY to June 30, 2026 |
| Lance (Peninsula Energy) | ISR | 42.46 | Life-of-mine plan AISC (study) | Plan dated September 2023 |
| Langer Heinrich (Paladin Energy) | Open pit | 43.30 | Cash cost | FY to June 30, 2026 |
| Kayelekera (Lotus Resources) | Open pit | 44.80 | Restart-plan AISC (study) | Plan dated October 2024 |
Source: issuer filings as compiled on our cost curve, which links each row to its document. Canadian and Australian dollar figures use the conversion each issuer prints. Methods are from our site profiles.
Two caveats sit inside those numbers. Cameco's cash cost excludes a non-cash C$11.32/lb, so its total production cost is higher than the headline. Ur-Energy reports per pound sold, which includes US$4.44/lb of production taxes.
Is ISR cheaper than conventional mining?
ISR (in-situ recovery) is often described as the low-cost method. On the costs operators disclose, it is not the cheapest. The six ISR operations that report an achieved cost run $28.38–$41.00/lb. The cheapest conventional operations, Cameco's high-grade Athabasca mines and Energy Fuels' Pinyon Plain, report $16.96 and $23.00/lb.
The sample is small and the bases differ, so this describes these operations and is not a general rule. Grade is the larger driver in this data: Canada's underground mines work ore so rich that it outweighs the higher cost of mining it. How each method works is in uranium mining methods and how ISR mining works.
Cash cost vs AISC vs incentive price
Three different numbers get called "the cost of uranium."
- Cash cost (C1) covers mining, processing and site costs per pound. It leaves out sustaining capital, so it understates the all-in figure.
- All-in sustaining cost adds the capital needed to keep production going. Kazatomprom defines its AISC as C1 cash cost plus capital cost; definitions vary by company.
- Incentive price is the sustained uranium price needed to justify building a new mine, including its capital and a return. We use $60–70/lb, a site assumption and not a published market figure.
Think of a restaurant. Cash cost is the food and staff bill, AISC adds replacing the kitchen equipment, and the incentive price is what it takes for someone to open a new restaurant. Our thesis page uses the incentive band in its scenarios.
What price brings idled mines back?
Few companies state a restart price, so we don't estimate one. What the record shows is where restarted mines landed. Langer Heinrich and Honeymoon both restarted in 2024 and now report $43.30/lb cash cost and $41.00/lb AISC. Kayelekera's restart plan targeted a steady-state AISC of $44.80/lb.
Restarts have done most of the work so far. The OECD-NEA/IAEA Red Book (2026 edition) attributes the rise in 2023–2024 production mainly to restarts of idled capacity and expansions at existing mines, and notes that no new uranium mining project began production in that period.
Producers don't sell at spot. Cameco's average realized price was US$65.78/lb in Q3 2026, against a quarter-end spot price of $89.63/lb (Cameco Q3 2026 MD&A). Margins depend on contract prices, which lag spot in both directions. Still idle on our list: Cameco's Smith Ranch-Highland (5.5 million lb a year nameplate) and enCore's Rosita (0.8 million lb a year), neither with a disclosed cost.
Frequently asked questions
How much does it cost to produce a pound of uranium? Operating mines that disclose a cost report $16.96–$43.30/lb U₃O₈, mostly on a cash-cost basis (our cost curve, rows curated October 30, 2026). All-in sustaining costs, where reported, sit at $38.45 (Kazatomprom) and $41.00 (Boss Energy).
What is the cheapest uranium mine? Among disclosed costs, Cameco's Cigar Lake and McArthur River share the lowest figure, a company-wide cash cost of $16.96/lb for FY2025. That excludes a non-cash C$11.32/lb, and Kazakh mines that publish only a fleet AISC are not directly comparable.
What is the uranium incentive price? It is the sustained price needed to justify building new mines. We use a $60–70/lb band, a site assumption rather than a published figure. Development projects on our curve quote study costs from $9.98/lb (NexGen's Arrow, operating cost only) to $44.50/lb (Deep Yellow's Tumas AISC), before their upfront capital.
Sources
- Yellowcake Analytics cost curve: issuer filings cited per row, curated October 30, 2026; spot and coverage figures read November 17, 2026.
- OECD NEA and IAEA, Uranium 2026 (Red Book) press release, September 14, 2026.
- Cameco, Q3 2026 MD&A.
Informational only, not investment advice. Every figure links to its primary source so you can check it yourself.